Kennedy Town Swimming Pool TFP Farrells

2012-07-13 00:00
架构师提供的文本描述。新泳池大楼占地约0.8公顷,分两期兴建。第一期工程-建造室外二级游泳池和休闲池-已于2011年5月完成并向公众开放。计划于2016年完成的第二阶段工程将包括提供一个多用途游泳池、一个教学池和一个按摩浴缸。
Text description provided by the architects. Occupying an area of approximately 0.8 hectare, the construction of the new swimming pool complex involves two phases. The first phase of the works – the construction of an outdoor secondary pool and leisure pool – has been completed and opened to the publicin May 2011. The second phase of the works, scheduled to be completed in 2016, will include the provision of a multi-purpose pool, a teaching pool and a jacuzzi.
 Courtesy of TFP Farrells
由TFP Farrells提供
新泳池大楼位于坚尼地城海旁与盛西路交界处,西面以西翔街北为界。当车辆或电车由中环经干诺道西及皇后大道西驶入坚尼地城入口处。
The site of the new swimming pool complex is located at the junction of Kennedy Town Praya and Shing Sai Road and bounded at the western end by Sai Cheung Street North. The site marks the entrance to Kennedy Town when approached by car or tram from Central via Connaught Road West and Queen’s Road West.
 © Marcel Lam
(C)林瑞麟
邻近的建筑物主要是35层高的住宅大厦。往西是卑路乍湾公园,该公园横跨一座市区,为社区提供大量景观美化的休憩用地。在北面,横过盛西路的是西区公众货物装卸区及其后的维多利亚港。
Neighbouring buildings are predominantly residential towers of up to 35 storey height. Towards the west of the Site is Belcher Bay Park which extends over one city block and provides substantial landscaped open space for the community. To the north, across Shing Sai Road is the Western District Public Cargo Working Area and Victoria Harbour beyond.
 © Marcel Lam
(C)林瑞麟
一个新的游泳池建筑群旨在丰富当地社区,提供一种方便出入的公共设施,补充现有的公共设施,并有助于增强坚尼地城的特色;目前,肯尼迪城的定义是以社区中心处的历史电车线为界定的。设计简介是一个标志性的结构,包括室内和室外游泳池、按摩浴缸、更换设施以及相关的管理和厂房。一些主要的设计考虑因素包括建筑物的透明度、对现有景观走廊的反应、对相邻住宅塔的敏感性、与维多利亚港的关系以及环境上可持续的设计解决方案。
A new swimming pool complex designed to enrich the local community by providing a public facility that is easily accessible, complementary to existing public amenities and will contribute to the character of Kennedy Town; which is currently defined by the historic tram line that terminates in the heart of the community. The design brief was for an iconic structure, housing both indoor and outdoor swimming pools, Jacuzzis, changing facilities and associated management and plant rooms. Some of the key design considerations include the building’s transparency, response to existing view corridors, sensitivity to adjacent residential towers, the relationship to Victoria Harbour and an environmentally sustainable design solution.
 
 
 
 
 
 
 
 
 
 
 
 
 

                    

举报

永动机小黄牛

什么也没写

1795 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年