Student Housing Campus Eindhoven University of Technology Office Winhov + Office haratori + BDG Architecten

2017-03-16 05:00
 © Stefan Müller
斯特凡·穆勒
架构师提供的文本描述。1957年,根据S.J.van Embden的城市发展计划,开始建造Eindhoven技术大学(TU/E)。他的设计旨在为技术研究和研究创造一个理想的工厂环境,其中包括高耸的现代建筑,它们彼此相连,并通过空中走道与它们之间的实验室和车间连接起来。该计划遵循现代理想的独立建筑,在一个持续的景观。校园第一代建筑的幕墙体现了建筑遵循固定网格模式的合理结构。按照原来的设计,已制定了校园重组和扩建的总体计划。它设想在校园的北面、多梅勒青溪谷的边缘为学生和研究人员提供住宿。
Text description provided by the architects. Work began on building the Eindhoven University of Technology (TU/e) in 1957 based on the urban development plan of S.J. van Embden. His design aimed at creating an idealised factory environment for technical research and study consisting of tall, modern buildings on stilts that were connected with one another and with the laboratories and workshops located in between them by means of aerial walkways. The plan followed the modern ideal of self-contained buildings in a continuous landscape. The rational structure in which the buildings followed a fixed grid pattern was expressed in the curtain walls of the first generation of buildings on the campus. A master plan for the re organisation and expansion of the campus has been drawn up following the original design. It envisages the introduction of accommodation for students and researchers on the north side of the campus on the edge of the green brook valley of the Dommel.
 © Stefan Müller
斯特凡·穆勒
 Axonometric

                            
 Axonometric

                            
 © Stefan Müller
斯特凡·穆勒
楔形建筑的位置和方向与校园内较高的建筑系列是一致的。这座建筑完全是预制的。承重立面由混凝土夹层构件组成,其连续网格反映了校园旧建筑的外观。墙壁面板带的正面被抛光,与墙壁的封闭部分形成了更强的对比,并使栅格在立面构图中有一个自主的位置。除了外墙外,地面、浴室和设施也是预制的,以便在很短的时间内建成。楔形建筑在中央走廊被错开,在最后的正面形成了三重连接。这种划分为三个有利于合理地分配房间和集体公寓。它也给建筑一个优雅的外观和一个动态的,不对称的外观,无论是在面对校园和面对多梅尔。
The position and orientation of the wedge-shaped building are aligned with the series of taller buildings on the campus. The building is entirely prefabricated. The load-bearing façade is made of concrete sandwich elements whose continuous grid reflects the façades of the old buildings on the campus. The front side of the wall panel bands are polished, providing a stronger contrast with the closed sections of the wall and giving the grid an autonomous position in the façade composition. Besides the outer walls, the floors, bathrooms and installations are also prefabricated to enable the building to be constructed within a very short time. The wedge-shaped building has been staggered around the central corridor, creating a triple articulation in the end facades. This division into three facilitates a logical distribution of the rooms and group flats. It also gives the building an elegant appearance and a dynamic, asymmetrical look, both on the side facing the campus and on that facing the Dommel. 
 © Stefan Müller
斯特凡·穆勒
 
 © Stefan Müller
斯特凡·穆勒
这座建筑与校园的顶端保持一致,但在多梅尔河的绿色溪谷完全独立。到达后,居民通过自行车棚和集体空间,它们彼此有着相同的视觉轴,与周围的景观相通,到达北侧的电梯。
The building is aligned with the top end of the campus but is otherwise entirely freestanding in the green brook valley of the Dommel. Upon arrival, residents pass through the cycle shed and the collective space, which share the same visual axis with one another and with the surrounding landscape, to reach the lifts on the north side. 
 © Stefan Müller
斯特凡·穆勒
 © Stefan Müller
斯特凡·穆勒
电梯通过两层电梯大厅将它们传送到不同楼层的房间。每层楼都有一个集体户外区域,面向南,可以俯瞰校园。集体区域的尺寸过大,使其适合于会议和活动。这就创造了一系列的空间,从大学的地形延伸到各个房间,为校园生活提供了明确的附加值和活力。
The lifts convey them via the two-storey lift lobbies to their rooms on the different floors. There is a collective outdoor area on each floor facing south with a view over the campus. The over-dimensioning of the collective areas makes them suitable for meeting and activities. This creates a series of spaces extending through the building from the university terrain to the individual rooms, giving an explicit added value and liveliness to living on a campus. 
 © Stefan Müller
斯特凡·穆勒
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Architects Office Winhov, Office haratori, BDG Architecten
Location De Lismortel, 5612 Eindhoven, The Netherlands
Category Dorms
Design Team Joost Hovenier, Jan Peter Wingender (Office Winhov), Zeno Vogel (office haratori) met Gerard Jansen (BDG Architecten Ingenieurs)
Area 12410.0 m2
Project Year 2016
Photographs Stefan Müller
Manufacturers Loading...

                    

举报

黑白时间

什么也没写

1815 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年