City of Bothell Public Works Operations Center Administration Building Hutchison - Maul Architecture
2011-05-21 01:00
架构师提供的文本描述。这是和记黄埔设计的首个大型公共工程。
Text description provided by the architects. This is the first major public project designed by Hutchison & Maul Architecture. The site is located in the Canyon Park Development north of downtown Bothell. The new 2-story 16,000 sf administration building utilizes conventional steel framing with metal siding and roofing. The building is long and narrow, and oriented in the east-west direction to minimize solar gain and maximize natural cross ventilation through operable windows.
课程要求包括办公室、更衣室和午餐室的空间,作为备用的平机会和公共会议室。二楼开放式办公区域通过大窗户墙向北提供广阔的湿地景观,并通过大屋顶天窗提供平衡的自然光。在建筑物的西端有一个深屋顶悬臂,减少了阳光照射,并提供了一个有盖的室外露台区,毗邻餐厅。市政府正在为行政大楼寻求LEED银牌认证。
Program requirements included spaces for offices, locker rooms, and a lunch room which is designed to serve as a back-up EOC and public meeting room. A second floor open office area provides expansive views across wetlands to the north through a large window wall, and balanced natural light is provided through large roof skylight. A deep roof cantilever at the west end of the building reduces sun exposure and provides for a covered outdoor patio area adjacent to the lunch room. The City is seeking LEED Silver certification for the administration building.
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计