Lyneham Performing Arts Centre HBO+EMTB
2011-12-13 00:00
© Ben Wrigley - Photohub
本·箭牌-摄影中心
Lyneham表演艺术中心(LPAC)是一个声学工程,目的建筑设施,容纳日常运作的音乐部门的利奈汉姆高中,以及为当地社区提供排练和表演空间。
The Lyneham Performing Arts Centre (LPAC) is an acoustically engineered, purpose built facility that houses the day-to-day operations of the music department of Lyneham High School, as well as providing a rehearsal and performance space for the local community.
© Ben Wrigley - Photohub
本·箭牌-摄影中心
Lyneham高中是澳大利亚堪培拉市的一所内城州立学校,以其表演艺术项目而闻名于世。学校有着浓厚的音乐文化,有470名学生参加了乐队方案,120名学生参加了音乐剧方案,共有750名学生参加了音乐活动和课程。
Lyneham High School is an inner city state school in Canberra, Australia which is renowned for its performing arts programs. The School has a strong culture of music with 470 students enrolled in the Band Program, 120 students in the Musical Theatre Program and a total of 750 students participating in music activities and classes.
© Ben Wrigley - Photohub
本·箭牌-摄影中心
初步设计大纲要求设立一个新的乐队练习室、教学及支援场地,以及翻新现有的学校会堂,以加强其作为表演场地的用途。在审查了简报之后,HBO EMTB确定,可以在预算范围内提供一个新的音乐和表演用途设施。然后,这个空间可以用特殊的声学来设计,以补充大厅和附属空间的活动。
The initial design brief asked for a new band practice room, teaching and support spaces and refurbishment of the existing school hall to enhance its use as a performance space. After reviewing the brief, HBO+EMTB established that a new purpose built facility for music and performance could be provided within the budget. This space could then be designed with exceptional acoustics that would complement activities in the main hall and ancillary spaces.
© Ben Wrigley - Photohub
本·箭牌-摄影中心
莱纳姆表演艺术中心设有300个座位的礼堂,设有体育场座位、键盘实验室、教室、工作人员室和五个练习室,以及众多的户外表演场地。
The Lyneham Performing Arts Centre features a 300-seat auditorium with stadium seating, keyboard laboratory, classroom, staff room and five practice rooms, as well as numerous outdoor performances areas.
© Ben Wrigley - Photohub
本·箭牌-摄影中心
该建筑的关键技术部分是使用预制夹层板,这些夹层板具有完全封闭的绝缘芯。质量保持在三明治的内部,以获得热和声学方面的好处。自定义设计面的内部表面创造适当的混响时间和声音的分布。性能空间的天花板和照明是为从标准平台轻松访问而设计的。机械设备包含在织物管道中,如果不使用,这些管道会透气,并与剧院的窗帘和设备混合使用。
The key technological component of the building is its use of precast sandwich panels which have fully enclosed insulated cores. Mass is kept to the inside of the sandwich for thermal and acoustic benefits. Custom designed faceting to the interior surface creates appropriate reverberation time and distribution of sound. The ceiling and lighting of the performance space is designed for easy access from a standard platform. The mechanical services are contained in fabric ducts which deflate when not in use and blend with the theatre curtains and equipment.
© Ben Wrigley - Photohub
本·箭牌-摄影中心
音乐教学室两边都是完全绝缘的,隔音的练习室。这允许一个音乐课分成六个单独的小组,练习他们的部分,然后返回中央空间进行组合练习。这种安排有效地隔离了教室和相邻的空间。
The music teaching room is surrounded on two sides by fully insulated, sound isolated practice rooms. This allows a music class to split into six individual groups and practice their parts and then return to the central space for a combined practice. This arrangement effectively insulates the classroom and the adjacent spaces.
Floor Plan
自今年年初开学以来,该校有越来越多的学生选择音乐作为选修课。通过为音乐课程建立一个单独的用途设施,整个学校的教学成果得到了改善。午餐时间音乐会的文化已经发展起来,当地的音乐团体也蓬勃发展,因为他们现在可以进入当地的专业音乐空间。
Since opening earlier this year, the School has had an increased number of students choosing music as an elective. Teaching and learning outcomes have improved for the whole School by having a separate purpose built facility for music courses. A culture of lunch time concerts has developed and local music groups have flourished as they can now access a local professional music space.
推荐作品
下载