Orchestra Of St. Lukes H3 Hardy Collaboration Architecture
2012-03-15 00:00
架构师提供的文本描述。H3已经将一座为百老汇以外剧院设计的建筑的下半部改造成了该国首屈一指的室内乐乐团圣卢克乐团的永久住所。
Text description provided by the architects. H3 has transformed the lower half of a building designed for Off Broadway theaters into the permanent home for the Orchestra of St. Luke’s, the country’s premier chamber orchestra.
迪曼娜中心是该市第一家为古典音乐社区提供补贴的出租彩排和录音中心。该节目包括9个不同大小的彩排室,一个音乐图书馆,听力室,高地板的办公室,有很多灯光,大厅和休息区。
The DiMenna Center is the city’s first subsidized rental rehearsal and recording center for the classical music community. The program includes nine rehearsal rooms of various sizes, a music library, listening rooms, offices on a high floor with lots of light, lobby and lounge areas.
© Francis Dzikowski – ESTO
c弗朗西斯·齐科夫斯基-埃斯托
这座建筑位于曼哈顿市中心,坐落在林肯隧道附近,位于Baryshnikov艺术中心舞蹈工作室的下方。该中心包含五个空间,以不同的大小和形状进行声学设计。空间的设计是为了消除多层建筑内的外部噪音。主要彩排室的特点是“盒装”结构,每个房间漂浮在垫子和弹簧内的隔音盒由混凝土和混凝土砌块组成。
Located in midtown Manhattan, the building sits nearby the Lincoln Tunnel and below the dance studios of Baryshnikov Arts Center. The Center contains five spaces acoustically designed in varying sizes and shapes. Spaces are designed to eliminate outside noise within the multi-story building. The main rehearsal rooms feature a “box-in-a-box” construction, with each room floating on pads and springs inside an acoustic isolation box made of concrete and concrete block.
© Francis Dzikowski – ESTO
c弗朗西斯·齐科夫斯基-埃斯托
墙的特征是C
The walls feature C&C machine custom milled panels with micro and macro perforations in semi-random patterns, to both absorb and diffuse sound. Similarly composed ceilings allow for flexible technology, recording, playback, and proper reflectivity.
© Francis Dzikowski – ESTO
c弗朗西斯·齐科夫斯基-埃斯托
迪曼娜古典音乐中心是音乐家们的新家,包括精心设计的排练场地、休息室和咖啡厅,这两处区域都是非正式会议区,提供餐饮服务。该项目期待一个LEED-CI白金等级。项目组设计的中心围绕音乐家的经验-创造一个温暖,欢迎,健康的内部环境。由于预计到LEED-CI白金评级,该项目在建筑围护效率提高23%,机械系统效率提高81%,用水减少32.7%,以及75%建筑废物的回收或再利用,包括将现有剧院座位和电梯捐赠给其他非营利组织方面,表现出色。
The DiMenna Center for Classical Music is a new home for musicians, including richly finished rehearsal spaces and lounge and café areas that double as informal meeting areas with catered food service. The project is anticipating a LEED-CI Platinum rating.The project team designed the Center around the musicians’ experience—creating a warm, welcoming, and healthy interior environment. Anticipating a LEED-CI Platinum Rating, the project excels in a 23% increase in building envelope efficiency, an 81% efficient mechanical system, a 32.7% reduction in water usage, and the recycling or reuse of 75% of construction waste, including the donation of the existing theater seats and elevators to other non-profit organizations.
© Francis Dzikowski – ESTO
c弗朗西斯·齐科夫斯基-埃斯托
推荐作品
下载