Central Michigan University Events Center SmithGroupJJR

2013-01-06 00:00
架构师提供的文本描述。在成功完成由SmithGroup和Don Eyberg Associates进行的可行性研究之后,SmithGroup正在为现有的Rose竞技场和Rose/Ryan Hall的增加/翻新提供建筑和工程服务。该项目将包括在竞技场内安装所有新座位;增加一个新的入口、北大堂和扩建南大堂;增加一个新的练习设施;建造一个高级座位/俱乐部会议室;改善竞技场的基础设施,包括安装空调和为更多浴室安装新水管。
Text description provided by the architects. Following the successful completion of a feasibility study, performed by SmithGroup and Don Eyberg Associates, SmithGroup is providing architectural and engineering services for the addition / renovation of the existing Rose Arena and Rose/Ryan Hall. The project will include Installation of all new seating within the arena; the addition of a new entrance, north lobby and the expansion of the south lobby; the addition of a new practice facility; the construction of a premium seating/club room area; infrastructure improvements to the arena including the installation of air conditioning and new plumbing for additional bathrooms.
 © SmithGroupJJR
© SmithGroupJJR
现有的竞技场暖通空调系统已经升级到位,以增加空调的成本效益。紧凑型机械房中的四个主要供电扇是通过安装更大但更薄的过滤器和加热线圈而保留下来的。这节省了足够的地板空间,降低了空气阻力,足够插入冷水冷却线圈,而不改变风扇,马达马力,供应管道或墙壁。
Existing arena HVAC systems were upgraded in place to add air-conditioning cost-effectively. Four main supply fans in compact mechanical rooms were retained by installing larger but thinner filters and heating coils. That saved enough floor space and lowered air resistance enough to insert chilled-water cooling coils—without changing fans, motor horsepower, supply ductwork or walls.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

                    

举报

学习小马达

什么也没写

1837 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年