Text description provided by the architects. BVN were commissioned in 2004 by the Zoological Parks Board of New South Wales to design and document the new upper entrance, carpark and lower entrance for Taronga Park Zoo. The project was one of a series of major projects progressively being planned and implemented in accordance with the masterplan for Taronga Zoo. The masterplan provides a framework for the Zoo’s renovation, refurbishment and redevelopment over a 12 year period.
在为期六个月的方案设计和设计开发期间,与Taronga利益攸关方举行了定期设计会议,其中包括生命科学、教育和口译经理、客服和商业业务经理、营销经理以及基本工程和基础设施,以及Taronga Park动物园的成本规划师,为该项目制定设计和详细的成本计划。
During a six month schematic design and design development period regular design meetings were held with the Taronga stakeholders including the Director and CEO, Life Sciences, Education and Interpretation Managers, Guest and Commercial Operations Managers, Marketing Managers and Capital Works and Infrastructure, along with Taronga Park Zoo’s Cost Planner to develop a design and detailed cost plan for the project.
BVN与以下当局进行了详细协商:新南威尔士州遗产办公室、DIPNR、Mosman理事会、悉尼巴士、国家公园和野生动物管理局、道路和交通管理局(RTA)、悉尼海港前滨管理局和Mosman居民。
BVN consulted at length with the following authorities: Heritage Office of NSW, DIPNR; Mosman Council; Sydney Buses; National Parks and Wildlife Service; Roads and Traffic Authority (RTA); Sydney Harbour Foreshore Authority; and Mosman Residents.
动物园主要上入口的设计包括增设游客泊车位、新巴士及旅游巴士湾及专用巴士泊车位、新的“外广场”行人区、文物翻新上入口处大楼及电车棚,以及新的公众通道“内广场”,作为进入动物园的分解区。新建筑包括一家商店和一家咖啡馆,以及一座“设施楼”,包括售票、信息、出租、厕所和办公室,以及对分局本身及其毗邻的展品的解释。
The design of the main upper entry to the Zoo involved provision of additional visitor parking, a new bus and coach bay and dedicated coach parking, a new ‘outer plaza’ pedestrian area, heritage refurbishment of the upper entrance building and tram shed and a new public access ‘inner plaza’ operating as a decomposition zone on entry to the zoo. New buildings include a shop and café, and a ‘facilities building’ housing ticketing sales, information, hire, toilets and offices along with interpretation of the precinct itself and the exhibits immediately adjacent to it.
该提案力求利用和应对该网站的超乎寻常的潜力。设计原则强调:?“墙”?动物园作为花园的围场?砂岩高原?俯瞰动物园的被动边缘?不仅在视觉上,而且在使用方面,遗产建筑的意义?巨大的无花果树?花园中展馆的历史传统。
The proposal seeks to engage with and respond to the extraordinary potential of the site. Design principals put emphasis on: -- The ‘wall’ - the zoo as a garden enclosure -- The sandstone plateau - a passive edge overlooking the zoo -- The significance of the heritage building not just visually but in terms of use -- Giant fig trees -- The historical tradition of the pavilion in a garden
The third phase of the project was recently completed at end of 2011.
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计