Taray Sau Office Building MACLA Arquitectos
2013-05-22 01:00
工料测量师JoséLuis Navarro Sanleón外部面积1418平方米工程师方向Andrés Ortu Builder Miala S,L.预算901.072欧元
Quantity Surveyor José Luis Navarro Sanleón Exterior area 1418 m2 Engineer Direction Andrés Ortuño Builder Miala S,L. Budget 901.072 euros Promoter TARAY SAU
Taray SAU推广机构目前的办公室,被放置在一个三角形的地块豁免。这是一座孤立的建筑,里面有推销员的办公室,由于他的完美的保护条件,我们选择了保持,只攻击外部木工的替代和内部外观对品牌新面孔的充分性。
The current offices of Taray SAU promoter, are placed in a triangular plot exempt. It is an isolated building which contained the offices of the promoter and we opted to maintain due to his perfect condition of conservation, attacking only the substitution of the exterior carpentry and the adequacy of the interiors appearance to the new face of the brand.
这是一栋建在地下室里的大楼,预计将来会有办公室的扩建,还有一层楼高出地面,为发起人的不同部门提供住所。地下室被“英国宫廷”点亮,几何图形敏锐。建筑轨迹响应于地块的几何形状和方向准则,从而优化了建筑的期限行为。
It is a building developed in a basement, foreseen for a future extension of the office, and one floor above ground that shelters the different departments of the promoter. The Basement is a lit by “english court” with acute geometry. The building trace responds to the geometry of the Plot potente and orientation criteria to optimize the termal behavior of constructed.
扩建建筑是以现有建筑周围的“项链”建筑形式建造的,因此两者共存而不影响其规模。旧的和新的建筑物连接玻璃人行道,提供高透明度的内部和外部。项链的碎片是程序的不同部分,根据公司内部工作的需要放置。我们得到了这个战略,一个庭院,黑色砾石完成,视觉连接整个释放重要的工作以外的交通,这有利于一个最佳的环境,以发展这项工作。
The extensión building is constructed as a “necklace” building around the existing building, so that both coexist without interfering in their scales. The old and new buildings are connected with glass walkways that provide high transparency between interior and exterior. The pieces of the necklace are the different parts of the program that are placed according to the needs of the inner workings of the company. We got to this strategy a courtyard, black gravel finish, visually linking the whole releasing important jobs outside traffic which favors an optimal environment to develop the work.
情节的发展也经历了手术。为了提高建筑物的质量,提出了一种中性地面平面,以白色砾石或草为区域,仅保留了原地块中存在的一些大树。白色砾石的地幔包含了圆形,独特的芳香的地面覆盖和提供的颜色飞溅,这给整个抽象的程度和视觉组成的意愿与我们的项目。
The development of the plot also has undergone surgery. In order to enhance the building proposes a neutral ground plane finished with white gravel or grass as areas and only have remained some large trees existing in the original plot. The mantle of white gravel contains about circles distinct aromatic ground cover and provide splashes of color, which gives to the whole the degree of abstraction and visual compositional intend with our project.
有了这一切,建筑就会呈现出品牌的新面貌,这是一个当代的前沿,视觉标准应该与建设性齐头并进。对细节的关注是米斯·范德洛建设性“少即多”的最大体现。外墙采用混凝土盲抛光镀锌细木器,与现有建筑的粉刷墙和木制品形成鲜明对比-蚀刻玻璃墙和背光的草图,带有公司的标志,带有出入道路广告的空间模式。
With all this, the building assumes the new face of the brand, a contemporary and cutting edge where visual criteria should go hand in hand to the constructive. The attention to detail is the maximum of Mies Van der Rohe constructive "less is more". The exterior walls are of concrete blind and polished galvanized steel joinery, in sharp contrast with the whitewashed walls and woodworks of the existing buildingA draft of etched glass wall and backlit, with the logo of the company, which bears the access road advertising space mode.
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计