Update Student Housing in Sant Cugat del Vallès dataAE + HARQUITECTES
2013-07-05 01:00
建筑师数据AE,HARQUITECTES地点Sant Cugat del Vallès,巴塞罗那,西班牙类别公寓建筑师,负责Claudi Aguiló,Albert Domingo,David Lorente,Josep Ricart,Xavier Ros,Roger TudóIndiviations,Roger TudóInsumations,Enviromal咨询公司Orgànica Structure DSM ArquArchtes客户UPC/UUTE CompactHàBit I Constructora d‘Aro Construction Constructora’Aro,2012年项目面积为2400.0米的AdriàGoula‘Aro项目
Architects dataAE, HARQUITECTES Location Sant Cugat del Vallès, Barcelona, Spain Category Apartments Architect in Charge Claudi Aguiló, Albert Domingo, David Lorente, Josep Ricart, Xavier Ros, Roger Tudó Intallations ÀBAC enginyers Enviromental Consultant Societat Orgànica Structure DSM arquitectes Customer UPC / UTE Compact Hàbit i Constructora d’Aro Construction Constructora d’Aro Area 2400.0 sqm Project Year 2012 Photographs Adrià Goula
© Adrià Goula
(AdriàGoula)
为大学生建造的新住宅与Vallès建筑学校位于同一街区。建议的计划旨在维持现有楼宇、外围地区及新住宅之间的平衡。新住宅是由两幢平行的街道大厦组成,铺在两层以上,中间有一个中庭隔开。
The new dwelling house for university students is located in the same block as the Vallès Architecture School. The project proposed intends to keep its balance among the existing buildings, outside areas and the new dwelling house, which is formed from two parallel to street blocks layed out over two floors and separated by a central atrium.
© Adrià Goula
(AdriàGoula)
由于这是建筑系学生的住宅,我们提出了一个程序,允许个人和群体之间的紧密联系,这是由于公寓内部的灵活性和中庭作为活动空间的潜在用途。
Since it is a dwelling house for architecture students, we have come up with a program that permits intense connections among the users both individual and group level, owing to the interior flexibility of the apartments and the potential use of the atrium as an event space.
该项目以工业化建设为基础,只使用一种由预制混凝土制成的无隔墙的房屋模块类型。每个单元只有必要的固定元件,简化整理和安装。大部分组件是通过干式制造系统安装和组装的,因此每个模块及其成品都可以拆卸、再使用或高度可回收利用。这座建筑是在两层以上分层的,目的是利用现有的地形,使入口无需使用电梯,并减少走廊和楼梯面积的50%。中央中庭将被覆盖*以创造一个中间的生物气候空间,以提高建筑的能源效率,同时节约建筑围护结构。
The project banks on industrialized construction by using just one housing module type made of pre-formed concrete without partition walls. Each unit has just the necessary fixed elements, simplifying finishing and installations. Most of the components are installed and assembled by dry-build systems so every module and its finishing can be dismantled and reused or highly recyclable. The building is layered out over two floors in order to take advantage of the existing topography making accessible entrances without the need of using elevators and to reduce a 50 percent of square meters in corridors and stairs. The central atrium will be covered* in order to create an intermediate bioclimatic space that increases the energy efficiency of the building and, at the same time, economizes the building enclosure.
© Adrià Goula
(AdriàGoula)
寿命周期分析表明,根据CTE条例,该项目可节省高达50%与建筑材料有关的能源和70%与标准建筑有关的能源需求。
The cycle of life analysis demonstrates that this project saves up to 50 percent the energy associated to construction materials and a 70 percent the energy demand in respect to standard buildings according to CTE regulations.
*明年中庭将覆盖一个温室屋顶。
*the atrium is going to be covered with a greenhouse roof next year
推荐作品
下载