Technology Building in Leuven de Jong Gortemaker Algra Architects
2013-12-10 01:00
采购产品考拉莫里斯阿尔格拉,Tycho Saariste,Iwein Meyskens客户大学医院Leuven制造商装货.多规格少规格
Colaborators Maurits Algra, Tycho Saariste, Iwein Meyskens Client University Hospitals Leuven Manufacturers Loading... More Specs Less Specs
大学校园边缘的新建筑不仅是一个必须接受的功能性建筑,当然也不是不可避免的入侵。事实上,它增强了季度的视觉吸引力,并在大约6000平方米的建筑面积上容纳了季度的能源和数据中心。由于功能原因,这座三层楼几乎是不透明的。有许多通风孔,但很少有地方可以玻璃,如两个楼梯在狭窄的一面和一个地区在一楼。
The new building on the edge of the university campus is not merely a functional building one has to accept, and certainly not an unavoidable intrusion either. Indeed, it enhances the visual appeal of the quarter and accommodates, on some 6000 square metres floor area, the quarter’s energy and data centre. For functional reasons the three-storey building is all but opaque. There are numerous ventilation openings but few places that could be glazed, such as the two staircases on either of the narrow sides and an area on the first floor.
从第一层到第一层,周边墙与外部绝缘预制混凝土组件关闭。隔热板是用黑色的丙烯酸衬里完成的。在这些前面,一个铝副框架支持600毫米深的纤维水泥叶片。二次外墙是一层额外的热防护层,也是抵御雨水和阳光的屏障。同样重要的是,考虑到它的形状和颜色,它是使建筑物外表美观的材料。封闭外墙前的叶片已安装在距垂直30度的位置。从正面看,从远处看,立面看上去不透明,呈现出独特的水平结构。从一个角度看,叶片似乎向一个遥远的消失点会聚。在近距离观察,外观再次变化,因为叶片之间的差距,向顶部的建筑似乎更宽。
From the first floor upwards, perimeter walls are closed with externally insulated precast concrete components. The thermally insulated panels are finished with black acrylic lining. In front of those, an aluminium subframe supports 600 millimetre deep fibre cement vanes. The secondary façade serves as an additional layer of thermal protection and a shield from rainwater and sunlight. Just as importantly though, and given its form and colour, it is the material that lends the building’s exterior its attractive appearance. The vanes in front of the closed exterior walls have been mounted at a pitch of 30 degrees from the vertical. In frontal view and from a distance the façades therefore appear opaque, displaying a distinct horizontal structure. Viewed at an angle, the vanes seem to converge towards a distant vanishing point. In close-up view the appearance changes yet again as the gaps between the vanes towards the top of the building become seemingly wider.
玻璃墙前的叶片有一个60度的螺距,这是另一个在24小时周期中发生变化的外观图案:白天,它呈现出更黑暗的背景,但当从这些表面后面被照亮时,就会变得非常明亮。
Vanes in front of glazed wall sections have a 60 degree pitch, proffering yet another façade pattern that changes during a 24 hour cycle: during the day it presents more of a dark background, but when lit from behind these surfaces become quite bright.
资料来源:A D Architecture Details No.41,Karl Kraemer Verrella Stuttgart,2013
Source project description: A+D Architecture + Detail No 41, Karl Kraemer Verlag Stuttgart, 2013
Architects de Jong Gortemaker Algra Architects
Location Herestraat 49, 3000 Leuven, Belgium
Architect in Charge THV Ar-Te, de Jong Gortemaker Algra – Stabo architecten
Photographs Marcel Van Coile , Toon Grobet
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计