Wilson Architects Tapped to Design MIT Hub for Nanoscale Research
2014-05-02 01:00
一旦在2018年完工,这座建筑的特色将是校园内“最安静”的空间-“一层专为先进成像技术而优化的、适合低振动和最小电磁干扰的楼层-以及一层教学实验室空间,预计将为2000名麻省理工学院(MIT)研究人员提供服务。”
Once complete in 2018, the building will feature the “quietest” space on campus - “a floor optimized for low vibration and minimal electromagnetic interference, dedicated to advanced imaging technologies - and a floor of teaching laboratory space that will serve an estimate of 2,000 MIT researchers.
Courtyard between MIT.nano and Building 4 looking west from Building 8 toward the Great Dome. Image © Wilson Architects Inc.
纳诺和4号楼之间的庭院,从8楼往西看,朝向大圆顶。图像(威尔逊建筑师公司)
Aerial image from the north. Image © Wilson Architects Inc.
来自北方的空中影像。图像(威尔逊建筑师公司)
建筑师威尔逊建筑师公司地址:麻省理工学院,马萨诸塞大道77号,马萨诸塞州,02139,美国类别研究所麻省理工学院团队Arne Abramson,Travis wanat,Robert Cunkelman,Frank Higson,Jack Mannion建筑经理特纳工程学院,科学学院200000.0英尺2项目年威尔逊建筑师公司。
Architects Wilson Architects Inc. Location Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139, United States Category Institute MIT Team Arne Abramson, Travis Wanat, Robert Cunkelman, Frank Higson, Jack Mannion Construction Manager Turner Construction School School of Engineering (SoE), School of Science (SoS) Area 200000.0 ft2 Project Year 2018 Photographs Wilson Architects Inc.
您可以了解更多的信息,能源基础的研究,将在这里进行。
You can learn more information about the energy-based research that will take place in the facility here.
推荐作品
下载