Bushwick Inlet Park Kiss + Cathcart

2014-05-07 01:00
景观建筑师Starr Whitehouse景观建筑师和规划师PLLC结构工程师Robert Silman协会土木工程师Langan工程
Landscape Architects Starr Whitehouse Landscape Architects and Planners PLLC Structural Engineers Robert Silman Associates Civil Engineer Langan Engineering & Environmental Services Inc MEP Engineers A.G. Consulting Engineering Lighting Design AWA Lighting Designers Green Roof Consultants Roofmeadow Manufacturers Loading... More Specs Less Specs
 © Paul Warchol
(Paul Warchol)
架构师提供的文本描述。布什威克湾公园把布鲁克林的滨水区从一个棕色的工业区变成了一个公共公园。该设计位于布鲁克林的威廉斯堡区,是东河沿岸雄心勃勃的滨水重建计划的第一步。设计团队将运动场、社区设施和纽约公园的维护和运营设施整合成一个6.2英亩的公园。
Text description provided by the architects. Bushwick Inlet Park transforms the Brooklyn waterfront from a brownfield industrial strip into a public park. Located in the Williamsburg section of Brooklyn, the design is the first step of an ambitious waterfront redevelopment along the East River. The design team has integrated a program of athletic fields, community facility and a NYC Park maintenance and operation facility into a 6.2-acre park.
公园包围了西侧的建筑,把大楼变成了一座绿色的小山,这样就可以让公众100%地进入公园。一条曲折的小径为ADA提供了通往山顶的通道,在那里,一个巨大的木框架天篷为曼哈顿的天际线提供了遮荫和游乐场的视野。为公众和公园工作人员提供直接的建筑通道是从下面的街道边缘提供的。
The Park wraps over the building on the west side, turning the building into a green hill so that 100% of the site is accessible to the public. A zigzag path provides ADA access to the top, where a large wood-framed canopy provides shade and views over the play fields to the Manhattan skyline. Direct building access for the public and the Parks staff is provided from the street edge below.
 Floor Plan

                            
 
 
 
 
项目:13,300平方英尺一楼分为北段,公园和游憩部的维修设施,以及由非盈利的休憩用地联盟经营的社区中心南段。每个程序区都有自己的独立入口。
Program: The 13,300-square-foot ground floor is divided into the northern section which houses the maintenance facilities for the Department of Parks and Recreation, and the southern section which is a community center run by the non-profit Open Space Alliance. Each program area has its own separate entrance.
第一阶段(运动场)于2010年夏季开幕,第二阶段于2013年10月开幕。
Phase 1 (the play field) opened summer 2010 and Phase 2 opened October 2013.
 © Paul Warchol
(Paul Warchol)
建筑性能:最初的项目要求是在公园里建造一座LEED银制建筑。然而,设计团队强烈认为,敏感滨水区的公共空间需要使用、程序和环境的密集集成,并应针对更高的环境性能标准。该项目最大限度地利用公共空间,公园耸立在建筑物上方。在面向西北的绿色屋顶下,这座建筑被认为是地球遮蔽的,有控制的东南和西南阳光照射。尽管有地下建筑的经验(抽象的再生铝树根吊灯突出大厅天花板),所有被占用的空间,包括大厅,有丰富的自然光。
Building Performance: The initial program requirements just called for a LEED Silver building in a park. The design team, however, felt strongly that public space in a sensitive waterfront site required intensive integration of use, program, and environment, and should target a much higher environmental performance standard. The project maximizes public space, with the park rising up over the building. Under the northwest-facing green roof, the building is conceived as earth-sheltered, with controlled southeast and southwest solar exposures. Despite the subterranean experience of the building (with abstracted recycled aluminum tree-root chandeliers projecting through the lobby ceiling), all occupied spaces, including the lobby, have abundant natural light.
 Elevations

                            
以太阳能为主要动力的全电动机械系统不使用冷气机、烟道或排气口的屋顶空间,也不产生噪音或排放物。绿色屋顶的灌溉-这是如此密集使用的地面的一个关键要求-是由从操场洒水器中捕捉到的雨水和灰水提供的。
The all-electric, primarily solar-powered mechanical systems use no roof space for chillers, flues, or vents, and generate no noise or emissions. Irrigation of the green roof--a critical requirement for such an intensively used surface--is provided by captured rainwater and graywater from the playground sprinklers.
规划:该建筑是作为一个有用和美丽的公共空间,内外,响应城市和公园的不同情况。在公园一侧,建筑物和景观是一体的;在街道一侧,公共立面上有一个立式立木遮阳柱,标志着布鲁克林北部最重要的新公园的入口处。
Planning: The building is designed as a useful and beautiful public space, inside and out, responding to the differing conditions of the city and the park. On the park side, the building and landscape are one; on the street side, the public facades features a colonnade of vertical wood sunshades marking the entrance to the most significant new park in north Brooklyn.
 © Paul Warchol
(Paul Warchol)
绿点威廉斯堡海滨休憩用地总体计划是与许多社区团体共同制定的,目的是解决当地对2005年该社区的分区划分以及由此导致的滨水区密度增加的关切。公园为社区提供了进入滨水区的通道,无论是在物理上还是在概念上都是如此,因为它增强了社区的位置感和与曼哈顿的关系。它还提供了公园的土地和娱乐机会,在一个社区,有相对较少的开放空间。运动场是城市中使用最频繁的场地之一,足球比赛最多持续到晚上11:00。
The Greenpoint Williamsburg Waterfront Open Space Master Plan was developed in conjunction with many community groups, to address local concerns about the 2005 upzoning of the neighborhood and resultant increase in density along the waterfront. The park gives the community access to the waterfront, both physically and conceptually as it reinforces the neighborhood’s sense of place and relationship to Manhattan. It also provides park land and recreational opportunities in a neighborhood which had comparatively little open space. The athletic field is one of the most heavily used fields in the city, with soccer games running until 11:00 most nights.
 © Paul Warchol
(Paul Warchol)
北九街被延伸为布什威克湾公园南边的一条步行街,加强了现有的街道网格,并将其延伸到水中。该公园的目的是继续国家公园的道路从南方,并连接到未来各阶段的总体规划向北。
North 9th Street was extended as a pedestrian path at the southern edge of Bushwick Inlet Park, reinforcing the existing street grid and continuing it to the water. The park was designed to continue the State Park’s pathways from the south and to link to the future phases of the Master Plan to the north.
 © Paul Warchol
(Paul Warchol)
绝大多数游客是乘坐公共交通工具或骑自行车来的。在几个街区内有公共汽车、地铁、东河码头、自行车道、花旗自行车共享码头和许多居民。唯一提供的停车场是为公园维修人员提供的,北院子的绿色屋顶下有六个停车位,车库里有两个停车位。
The vast majority of visitors come by public transport or bicycle. Within a few blocks there is bus, subway, an East River Ferry dock, a bike path, a Citi Bike share dock, and many residents. The only parking provided is for park maintenance personnel, with six spaces under the green roof in the north yard, and two inside in the garage.
 © Malcolm Pinckney
c.马尔科姆·平克尼
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Architects Kiss + Cathcart, Architects
Location 86 Kent Ave, Brooklyn, NY 11249, United States
Category Park
Area 13300.0 ft2
Project Year 2013
Photographs Paul Warchol, Malcolm Pinckney
Manufacturers Loading...

                    

举报

柒十二凉

什么也没写

1785 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年