架构师提供的文本描述。该项目占地39 000平方米,分两个阶段交付。第一阶段主要涉及新建筑群的建设。它包括一个50米x 25米的室内恒温主池、一个25米x 30米的室内恒温训练池、一个可容纳1 500名观众的室内观众站、一个50米x 21米的室外二级游泳池、两个25米x12.5米的室外教学池、一个日光浴区和附属设施。新泳池大楼落成后,将展开拆卸现有泳池及兴建游乐场的工程。
Text description provided by the architects. The project, which occupies an area of 39,000 square metres, will be delivered in two stages. The first stage primarily covers the construction of the new complex. It includes a 50-metre x 25-metre indoor heated main pool, a 25-metre x 30-metre indoor heated training pool, an indoor spectator stand with a seating capacity for 1,500 spectators, a 50-metre x 21-metre outdoor secondary pool, two 25-metre x 12.5-metre outdoor teaching pools, a sunbathing area and ancillary facilities.The second stage, to be commenced upon completion of the new swimming pool complex, involves the demolition of the existing pool and construction of a recreation ground.
Architects Ronald Lu & Partners
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计