Serge Baranx School Refurbishment Pierre Marsan
2014-09-06 01:00
架构师提供的文本描述。Monforten Chalosse项目包括重建一所标准中学,该中学由几座异构建筑组成。
Text description provided by the architects. The Monfort en Chalosse project consists of the redevelopment of a standardized secondary school composed of several heterogeneous buildings.
少数有意合成的设计建筑和有意识地使用材料创造了一个建筑的联系,在城市的规模,在广阔的景观。
The insertion of few intentionally synthetic design building and the conscious use of materials create an architectural link at the scale of the city within the vast landscape.
该景观交替渗透和保水区,利用屋顶雨水在现场的水管理。该项目还包括开发和实施适当的、有趣的标志,以进入房地。
The landscaping alternates permeable and water retention areas that makes use of roof rain water for water management within the site. This project also includes the development and implementation of appropriate, fun signage to access the premises.
在被占用的场地内,这项工程需要在18个月内仔细地分阶段进行,以便在学校放假期间遵循计划的顺序。
Within an occupied site, this project required very careful phasing of the works over a period of 18 months to follow a planned sequence during school holidays.
Location 40380 Montfort-en-Chalosse, France
Photographs Arthur Pequin
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计