La Canaleta School 2260mm Arquitectes
2015-02-26 16:00
建筑师米格尔·安赫尔·阿尔卡德,玛丽亚·普切,安娜·佩雷斯,约瑟夫·卡雷拉项目结构丹尼尔·维达尔,米格尔·内瓦多建筑结构公司曼努埃尔·阿吉霍工程公司,JSS工程公司,声学公司,伊凡纳公司销售预算Núria Roig数量测量师Carles Giner Construccions Deco制造商.多规格少规格
Collaborator Architects Miguel Angel Alcalde, Maria Puche, Anna Perez, Josep Carrera Project Structure Daniel Vidal, Miguel Nevado Construction Structure Manuel Arguijo Engineering JSS enginyers Acoustics Ivana Rossell Budget Núria Roig Quantity surveyor Carles Giner Contractor Construccions Deco Manufacturers Loading... More Specs Less Specs
© Lluís Bernat
Lluís Bernat
架构师提供的文本描述。这所学校位于该镇周边的正方形土地上,位于一处潜在的开发区域内。这座建筑孤零零地矗立在一个偏僻的地区,被一条被掩埋在学校和田野下面的大道所限制。
Text description provided by the architects. The school is located on square land in the perimeter of the town in an area of potential development. The building stands alone in a isolated area, limited by an avenue, that is buried beneath the school and fields.
Ground Floor Plan
建筑设计是面向未来广场的梳子框架(供每周上学和周末公众使用),里面有行政办公室、厨房、餐厅和健身房。两个垂直的翅膀分别位于一层和两层,教室位于幼儿园和小学。
The building design is a comb framework facing onto the future plaza, (for school weekly access and weekend public use) and inside you will find the administration office, kitchen, dining room and gym. The two perpendicular wings are on one and two floors respectively, where the classrooms are located for kindergarten and primary.
© Lluís Bernat
Lluís Bernat
中央露台:位于幼儿园和小学的两翼之间,与学校的入口大厅保持一致。露台照亮大厅,使人能看到横向的景致,帮助人在进入大楼时定位。现有的露台照亮了初级补充教室和幼儿园走廊,并使其通风。
The central patio: is located between the kindergarten and primary wings and aligned with the entrance hall to the school. The patio illuminates the lobby which enables a transversal view, helping one to orient upon entering the building. The primary complementary classrooms and kindergarten hallways are illuminated and ventilated by the existing patio.
© Lluís Bernat
Lluís Bernat
初级街道侧翼:主楼由一条高双倍的中央走廊组成,教室向北,位于一楼和一楼,南面有额外的教室,仅占一楼的一层。这种安排的结果是,在第一层(4.5米宽)的整个南立面有一个光线充足、通风良好的区域,形成了一个远远超过走廊的空间。它是一个综合在“小镇”内的有盖街道区域,是一个潜在的聚会场所,供学生们发展为一个多用途的大厅,在那里将进行不同的活动。在这个空间的阳台区域允许进入位于一楼的教室。
The primary street level wing: The primary wing consists of a central hallway which is double in height with classrooms orientated north, located on the ground floor and first floor. There are additional classrooms orientated to the south facade, which only occupy onestripon the ground floor. This arrangement results in a well-lit and ventilated area throughout the south facade on level 1, (4,5 meters wide) forming a space that consists much more than a hallway. It is a covered street area integrated within the “small town”, which is a potential meeting place for students to develop as a multipurpose hall where different activities will take place. A balcony area in this space allows access to classrooms located on the first floor.
© Lluís Bernat
Lluís Bernat
建筑:这所学校已经完全建立了一个交叉层压木板的结构。这个轻量级建筑系统是在非常低的执行时间30天内建成的。这些面板是在车间制造的,目的是减少废物和灰尘的产生,此外,它还包括大幅减少建筑物的二氧化碳排放量-这是因为交叉层压木板造成的,它创造了一种轻型建筑,造成了一个非常简单的地基和很低的碳足迹。
Construction: The school has been completely built with a structure of cross laminated timber panels. This lightweight construction system was built within a very low execution time of 30 days. The panels were made in the workshop, to reduce the generation of waste and dust.Additionally, It also includes a significant reduction in CO2 emissions from the buildingbecause of the cross laminated timber panels and it creates a light construction, which causes a very simple foundation and a very low carbon footprint.
© Lluís Bernat
Lluís Bernat
环境:木材外部覆盖一层隔热层,创造舒适的空间,避免热桥接。梳状布局鼓励教室和走廊之间的交叉通风。在教室和居民空间内的供暖系统加强了该系统,相反,它阻止了中间空间(如走廊)的加热。
The environment: The wood is covered externally by a layer of thermal insulation, creating comfortable spaces and avoiding thermal bridging. The comb shaped layout encourages cross ventilation between the classrooms and hallway. The system has been strengthened with a heating system that stays in the classrooms and resident spacesand in contrast prevents heating the intermediate spaces such as the hallways.
© Lluís Bernat
Lluís Bernat
长住空间内有散热器,空气由二氧化碳传感器控制,经过过滤和加热。中间空间得益于教室的供暖,辅之以自然交叉通风和空气交换系统。
There are radiators inside the long – residence spaces, renewing the air which is controlled with a CO2 sensor, filtered and heated. The intermediate spaces benefits from the heating of the classrooms, aided by natural cross ventilation and an air exchange system.
Architects 2260mm Arquitectes
Location Vila-seca, Tarragona, España
Category Schools
Architects in Charge Manel Casellas, Mar Puig de la Bellacasa
Area 3480.0 m2
Project Year 2014
Photographs Lluís Bernat
Manufacturers Loading...
推荐作品
下载