Graveney School Sixth Form Block Urban Projects Bureau
2015-04-24 06:00
结构工程师合作伙伴关系M
Structural Engineer Furness Partnership M&E Consultant Stuart McCurry & Partners Ltd QS MorganCarr CDM Coordinator MorganCarr Approved Building Inspector Clarke Banks Limited Main Contractor Ashe Construction CAD Software Used Vectorworks Client Graveney Trust Cost Approx £1.04 million Manufacturers Loading... More Specs Less Specs
© Kilian O’Sullivan
(KilianO‘Sullivan)
架构师提供的文本描述。UPB与Graveney学校合作开展了许多项目和项目,而六年级是学校工作人员、学生和设计团队之间积极合作的结果。后BSF,UPB提交了一系列潜在的项目,以资助投标,并成功地获得了一个学院的资本维护基金,为一个新的中六座后的学校用地。这座建筑为中六学生提供了宝贵的额外教学、学习和活动空间,并为格雷维尼的校园和众多优秀的建筑做出了积极的贡献。
Text description provided by the architects. UPB have worked with Graveney School on a number of projects and ventures and the Sixth Form Block is the result of a positive collaboration between the school staff, students and the design team. Post-BSF, UPB submitted a range of potential projects for funding bids, and were successful in securing an Academies Capital Maintenance Fund for a new Sixth Form Block to the rear of the school site. The building provides valuable extra teaching, study and events spaces for sixth form students, and makes a positive contribution to Graveney’s campus and host of fine architectural buildings.
Exploded View
资金筹措规则意味着,大楼必须按严格的时间表和预算交付,每平方米的目标成本远远低于现行准则。这所学校考虑购买一座现成的预制街区,但不相信它能提供的住宿质量。此外,位于二级上市的富泽敦大厦后面,意味着一般的预制建筑将很难通过规划。UPBs的简介是在时间和成本限制范围内提供一种智能和空间创新的替代方案。
The rules of the funding meant that the building had to be delivered on tight schedule and budget, with a target cost per sqm way below the current guidelines. The school considered buying an off-the-peg, prefabricated block, but were unconvinced about the quality of accommodation it would provide. Also, being situated behind the Grade 2 listed Furzedown House, meant that generic prefabricated buildings would be difficult to get through planning. UPBs brief was to provide an intelligent and spatially innovative alternative within the time and cost constraints.
© Kilian O’Sullivan
(KilianO‘Sullivan)
这座800平方米的建筑包括8间教室和一个带有阳台和画廊的双高独立书房。它是由交叉层合木建造,并有一个聚碳酸酯正面与窗口开放设计,以框架的观点横跨校园和周围的树木。
The 800sqm building includes 8 classrooms and a double-height independent study space with balconies and gallery. It is constructed from Cross Laminated Timber and has a polycarbonate front facade with window openings designed to frame views across the campus and surrounding trees.
© Kilian O’Sullivan
(KilianO‘Sullivan)
这座建筑为六年级学生的学习和社交创造了一个鼓舞人心和刺激的环境。由于昂贵的材料或内部装修的预算很少,建筑的构造和建筑-CLT框架、面板、包层和开口-塑造了这座建筑,并赋予了它强大、健壮和现代的特征。
The building creates an inspiring and stimulating environment for sixth form students to study and socialize in. With little budget for expensive materials or interior finishes, the tectonics and construction of the building - its CLT frame, panels, cladding and openings –are what shapes the building and gives it a strong, robust and contemporary identity.
Sectional Perspective
分段透视
设计的目的是以最小的手段达到最大的建筑产出,是客户和设计团队的毅力、意志和抱负相结合的产物,以达到意想不到的目的。
The design aims to achieve the maximum architectural output out of minimal means, and is the product of the combined perseverance, will and ambition of the client and design team to achieve something unexpected.
© Kilian O’Sullivan
(KilianO‘Sullivan)
Architects Urban Projects Bureau
Location Tooting, London SW17, UK
Category Schools
Area 698.0 m2
Project Year 2014
Photographs Kilian O’Sullivan
Manufacturers Loading...
推荐作品
下载