Marginal de Esposende Redevelopment Victor Neves Arquitectura e Urbanismo
2015-05-08 23:00
© Fernando Guerra | FG+SG
费尔南多·格拉
架构师提供的文本描述。导言
Text description provided by the architects. Introduction
该项目是Esposende市为Esposende河岸地区制定的城市管理总体计划的一部分,也是维克托·内夫斯·阿奎图拉e Urbanismo LDA办公室、Esposende市政厅和海港研究所以前举行的会议提出的职能方案的一部分。
The project is part of an overall plan for urban management set by the city of Esposende for the area of the river margin of Esposende and the functional program proposed in previous meetings held between the office Victor Neves Arquitectura e Urbanismo Lda, Esposende City Hall and the Maritime-Port Institute.
© Fernando Guerra | FG+SG
费尔南多·格拉
干预的主要内容是重组一条河流边的城市前线,以便创造一大片公共休闲区,周围环绕着几座与水上运动有关的建筑物。作为一般意图,我们包括需要保存该地点的景观和视觉特征,以及它作为优先公共空间的地位,而不是建筑空间。
The intervention consisted essentially in the reorganization of an urban front, bordered by a river, in order to create a vast area of public leisure, surrounded by several buildings relating to water sports. As a general intent, we include the need to preserve the landscape and visual identity of the site as well as its status as priority public space as opposed to built space.
© Fernando Guerra | FG+SG
费尔南多·格拉
对河岸空间的干预,在这种情况下具有强大的海洋影响,本来就充满了紧张局势,这是由于难以确定两种媒体之间的确切界限,而这种情况以不同的方式表现出来。
Interventions on river bank spaces, in this case with a strong maritime influence, are inherently fraught with tension arising from the circumstances of the difficulty of defining a precise boundary between the two media that are manifested in contrasting ways.
© Fernando Guerra | FG+SG
费尔南多·格拉
最初,该项目包括几个金属结构,支撑玻璃立方体(5x5x5米),将放置在河上的桥梁。由于监管和财政状况,这些结构没有包括在内。
Originally, the project included several metal structures, supporting glass cubes (5X5X5 meters), which would be placed in the river over a bridge. These structures were not included due to regulatory and financial conditions.
© Fernando Guerra | FG+SG
费尔南多·格拉
整项建议背后的概念如下:
The concept behind the entire proposal is as follows:
-优先考虑自然景观,否认人为的“设计”过度,也否认最近城市干预措施中经常显示的丰富的材料。
- To give priority to the natural landscape, denying the artificiality of the formal excesses of "design" and also denying the wealth of materials, often displayed in recent urban interventions.
-加强教育进程,创造一种不同于当地人民的办法,以丰富当地生态系统的动植物资源。
- To increase a didactic process, creating a different approach to the wealth of flora and fauna of local ecosystems, from the local people.
© Fernando Guerra | FG+SG
费尔南多·格拉
干预区由一个边缘前沿组成,受河口的强烈影响,在城市环境中,受向生产活动和娱乐用途流行之间平衡的急剧转变机制的影响。边缘部分在这一动态中起着重要作用。
The intervention area consists of a marginal front subject to the strong influence of the estuary, in an urban context influenced by sharp transformation mechanisms towards a balance between productive activity and the prevalence of a playful use. The marginal section assumes an important role in this dynamic.
© Fernando Guerra | FG+SG
费尔南多·格拉
干预措施主要集中於市区重建的水平,方法是设定两个主要方向,即在架空行人天桥上设立行人路,以及处理受潮汐波动影响的边缘。
The intervention focuses primarily on the level of urban redevelopment by setting two key vectors - the establishment of a footpath on an elevated footbridge and the treatment of the edge subject to tidal fluctuations.
高架人行桥构成了构图的核心,提供了现场体验的新环境,增强了我们想要实施的玩乐品质。这自然地延长了其起点两侧边缘保留线的路径。这是由具有双重功能的元素建造的,一方面,塑料打算作为风景和城市构成的中间元素,另一方面,空间将容纳直接的具体方案,其中涉及到显著的教学方法。
The elevated footbridge forms the centerpiece of the composition, offering new circumstances of the experience of the site and enhancing the playful character that we want to implement. This naturally lengthens the path of the marginal retention lines on both sides of their starting point. This was built by elements with a double function, on the one hand, the plastics intended as intervening elements of scenic and urban composition, on the other hand, spaces that will house direct specific programs involving an eminently pedagogical approach.
© Fernando Guerra | FG+SG
费尔南多·格拉
Architects Victor Neves Arquitectura e Urbanismo
Location Avenida Engenheiro Eduardo Arantes e Oliveira, 4740 Esposende, Portugal
Category Infrastructure
Project Architect Prof. Dr. Arqt.º Victor Neves
Collaborators Arqt.º David Correia, Arqt.ª Carla Anastácio
Project Area 25500.0 m2
Project Year 2007
Photographs Fernando Guerra | FG+SG
推荐作品
下载