Hazel Glen Child and Family Centre Brand Architects

2015-07-18 20:00
 © Wuttke Photography
乌特克摄影
架构师提供的文本描述。哈泽尔·格伦儿童与家庭中心(Hazel Glen Child And FamilyCentre)使用充满活力的琉璃砖,以及各种木料,创建一个欢迎家庭的中心。这座最先进的建筑由四间儿童保育室、妇幼健康咨询套房、各种大小的社区客房和一个中央灵活的社区集合空间组成。该中心位于富饶河谷的中心地带,以蜿蜒的墙壁和廊道线来参考蜿蜒的富足河,在中央空间中有隐喻的流动和漩涡,而屋顶则响应遥远的金湖恒河的地平线。
Text description provided by the architects. Hazel Glen Child and Family Centre uses a vibrant patchwork of glazed bricks, along with various timbers to create a welcoming family centre.  This state-of-the-art building consists of four childcare rooms, maternal and child health consulting suites, various sized community rooms and a central flexible community gathering space.  Located in the heart of the Plenty River Valley, the centre references the winding Plenty River in its meandering walls and verandah lines and with metaphorical flows and eddies through the central space, while the roofline responds to the horizon line of the distant Kinglake Ranges.
 © Wuttke Photography
乌特克摄影
哈泽尔格伦儿童和家庭中心的设计非常注重环境的可持续性。虽然建筑物是可持续设计的一个良好的技术范例,但关键的概念意图是以积极的方式将建筑物扎根于周围环境,并与自然世界建立经验联系,鼓励通过直接经验学习。
Hazel Glen Child and Family Centre was designed with a strong focus on environmental sustainability. While the building is a good technical example of sustainable design, the key conceptual intention was to root the building in its surroundings in a positive way and provide experiential connections with the natural world, encouraging learning through direct experience.
 Floor Plan

                            
品牌建筑师认为,建筑形式可以对教育环境做出重大贡献,我们认为,设计可持续的建筑是通过创造功能良好、充满活力和目标明确的空间来鼓励学习的最佳方式。
Brand Architects believe that the built form can contribute significantly to the educational environment, and we feel that designing sustainable buildings is the best way to encourage learning through the creation of well-functioning, spirited and purposeful spaces.
 © Wuttke Photography
乌特克摄影
当地政府的客户-惠特莱西亚市(City Of Whittlesea)-决心提供社区设施,为所有用户提供一个包容和健康的环境。如果没有客户在项目所有阶段的充分承诺,哈泽尔格伦儿童和家庭中心(Hazel Glen Child And Family Centre)等创新的最新发展项目就不可能实现。在建筑招标过程中开始了这一过程。该委员会确保他们将与建筑师和工程师合作,他们同样致力于设计高质量的社区建筑,并在设计过程和施工过程中得到加强和监督。
The local government client, The City of Whittlesea, was determined to deliver community facilities that provide an inclusive and healthy environment for all users.  An innovative state-of-the-art development such as Hazel Glen Child and Family Centre wouldn’t be possible without the full commitment of the client at all stages of the project.  The process of began during the architectural tendering process, where the council ensured they would be working with Architects and Engineers who were equally committed to designing quality community buildings, and was reinforced and monitored during the design process and through construction.
 © Wuttke Photography
乌特克摄影
惠特莱西亚市编写的简报呼吁建立一个欢迎、充满活力和可利用的综合性早期学习中心,为社会联系提供服务、活动和机会,该中心将包括两个幼儿园房间、一个长长的日托游戏室、一个多用途早年游戏室、共用工作人员设施和欢迎的主门厅。家庭服务项目咨询室和两个妇幼保健咨询室,并设有相关的等候区。
The brief developed by the City of Whittlesea called for a welcoming, vibrant and accessible integrated early learning centre, providing services, activities and opportunities for social connections.  The centre was to include two kindergarten rooms, one long daycare playroom, one multipurpose early years playroom, shared staff amenities, a welcoming main foyer, family services program consulting room and two maternal and child health consulting rooms with associated waiting areas. 
 © Wuttke Photography
乌特克摄影
该项目的费用为每平方米2 500美元,占地面积为1480平方米。对于地方政府项目,如这一项目,预算限制确实减少了可持续选择的数量,但我们也发现,它们导致仔细选择环境上可持续的设计措施,以便在现有资金方面取得最大的成果。
The cost of the project was $2,500 per square meter, for a fully enclosed covered area of 1480 sqm.  For local government projects such as this one, budget restrictions do reduce the number of sustainable options that are available, however we also found that they resulted in a careful selection of environmentally sustainable design measures in order to achieve the greatest outcomes for the money available. 
 
 
黑泽尔峡谷儿童与家庭中心位于气候温和的地区。这座建筑的设计反映了这样一个事实:在白衣地区,需要取暖的天数远远多于冷却时间-因此在建筑中包括了一个燃气的水合水板式加热系统、热质量和蒸发冷却系统。在一个温带的客户中,仔细定位和遮阳玻璃是保持舒适的内部温度和日光水平,这是与双层玻璃和彻底的建筑密封,以防止漏风的补充。
The Hazel Glen Child and Family Centre is located in an area of cool temperate climate.  The building has been designed to reflect the fact that there are far more days that require heating than cooling in Whittlesea – hence the inclusion of a gas-fired hydronic in-slab heating system, thermal mass and evaporative cooling in the building.  In a temperate client, careful orientation and shading of glazing is essential to maintain comfortable internal temperatures and daylight levels, this is complemented with double glazing and thorough building sealing to prevent air leakage.
 © Wuttke Photography
乌特克摄影
屋顶上的太阳能光伏阵列提供了15%的峰值建筑负荷,大大减少了夏季的能源消耗。采暖系统是以燃气为燃料的平板式水冷供暖,这是减少能源使用的最有效的供暖方案,尤其是在一个在地板上进行大量学习活动的托儿中心尤其有益。
The solar photovoltaic array on the roof provides 15% of the peak building load, greatly reducing energy use in summer.  The heating system is gas-fired in-slab hydronic heating, which is the most efficient heating option for reducing energy use, and is particularly beneficial in a childcare centre where a lot of the learning activities take place on the floor.
 
夜间净化大大降低了夏季冷却成本,因为建筑物在夜间使用较冷的空气自然冷却,这也确保了从白天开始就有新鲜空气-在缺乏夜间净化空间的建筑物中,必须在一夜之间关闭,使挥发性有机化合物(VOC)以废气的形式积累起来。屋顶上的气象站确保建筑系统适应外部环境。
Night purging greatly reduces summer cooling costs as the building is cooled down naturally at night using the colder air, this also ensures fresh air is available from the beginning of the day – in buildings that lack night purging spaces have to be shut up overnight, causing volatile organic compounds (VOC’s) to build up as materials off-gas.  A weather station on the roof ensures that the building systems adjust appropriately to the external conditions.
 © Wuttke Photography
乌特克摄影
雨水储存在一个50,300升的地下水箱中,再用于冲厕所、灌溉和洗衣。此外,一个小型地面水箱用于儿童的水游戏和教育,其中包括一个手泵,允许儿童手动从水箱中抽水。
Rainwater is stored in a 50,300L underground tank and reused in toilet flushing, irrigation and laundry washing.  In addition, a small above ground tank is used for the children’s water play and education, this includes a hand pump that allows children to pump water manually from the tank.
 © Wuttke Photography
乌特克摄影
客户希望取得五星绿色之星的成果,但决定不资助认证进程。包括Greenstar专业人员在内的设计团队使用公共建筑V1电子表格作为工具,根据潜在的信用记录跟踪设计。这一过程包括收集必要的证据,以便在对方案和收费没有影响的情况下提交。此外,该设计在对照可持续设计计分卡(SDS(可持续设计记分卡)进行评估时取得了“最佳做法”,可持续设计计分卡被墨尔本的一些委员会用来作为ESD规划的基础。
The client wished to achieve a five star Greenstar outcome but it was decided not to fund the certification process. The design team, which included Greenstar professionals, tracked the design against potential credits using the Public Buildings V1 Spreadsheet as a tool. This process included gathering the required evidence for submission where there was no impact on program and fees.  In addition, the design achieved ‘best practice’ when assessed against the SDS (Sustainable Design Scorecard), which is used by some council’s across Melbourne to as a basis for ESD in planning.
 © Wuttke Photography
乌特克摄影
惠特莱西亚市致力于跟踪黑兹尔峡谷儿童的表演
The City of Whittlesea is committed to following up the performance of the Hazel Glen Child & Family Centre with ongoing monitoring and performance analysis.  The Council have a committed ESD team who plan to regularly visit the centre and who are in the process of implementing the necessary procedures for post-occupancy building monitoring.
 © Wuttke Photography
乌特克摄影
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Architects Brand Architects
Location 65 Eminence Boulevard, Doreen VIC 3754, Australia
Category Community Center
Project Year 2015
Photographs Wuttke Photography

                    

举报

阿达

什么也没写

1774 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年