The Forum Studio 804
2016-01-13 10:00
© James Ewing Photography
詹姆斯·尤因摄影
架构师提供的文本描述。该论坛位于堪萨斯大学建筑系,由学生设计和建造,以满足美国绿色建筑委员会在能源和环境设计标准方面的领导地位,LEED v2009NC白金。这是最严格的新建筑认证的可持续设计,是由USGBC在建筑施工期间使用。它标志着Studio804连续第七个LEED白金建筑与其他几个杰出的建筑特色。它包括一个独特的正置换通风系统。在一年中温和的日子里,自然通风模式关闭了一次和室外空气系统,并采用交叉通风通过空间吸入新鲜空气。
Text description provided by the architects. The Forum, located in the Architecture department of University of Kansas, was designed and built by students to meet the United States Green Building Council's Leadership in Energy and Environmental Design standard, LEED v2009 NC Platinum. This is the most stringent new-construction certification for sustainable-design that was in use by the USGBC during the building construction. It marked Studio804's seventh consecutive LEED Platinum building with several other outstanding architectural features. It includes a unique positive displacement ventilation system. On mild days during the year, the natural ventilation mode shuts down both the primary and outdoor air system, and cross ventilation is used to draw in fresh air through the space.
© James Ewing Photography
詹姆斯·尤因摄影
周围的皮肤是由两堵独立的隔墙组成,隔开三英尺半。它们之间的空间为雪松百叶窗提供了空间。电动阻尼器位于外层的顶部和底部,允许冷空气在夏季开放时进入。百叶窗是由一个屋顶气象站控制,并被编程跟踪太阳。蕨类植物和秋海棠的活墙通过吸收和消散声音,为演讲空间提供额外的声学控制,并从水池中浇水。
The perimeter skin is made up of two separate walls of insulated glass, three-and-a-half feet apart. The space between them provides room for the cedar louvers. Motorized dampers are located at the top and the bottom of the outer layer which permit cool air to enter in the summer when open. The louvers are controlled by a rooftop weather station and are programmed to track the sun. The living wall of ferns and begonias provides additional acoustic control for the lecture space by absorbing and dissipating sound and is watered from the cistern.
郁郁葱葱的植被通过自然过滤空气中的毒素,有助于改善室内空气质量。除此之外,设置LED灯、光伏板、水回用和回收利用材料也是这座建筑的另一个重要方面。建筑工程是从拆除建筑大楼南侧的一个室外车间开始的。现有的棚屋-电力服务-必须继续运作。其结果是,在现有的机械室之上精心建造,这成为了新的玻璃围封121个座位的礼堂和一个“陪审团室”的场地,在入口处有一个很大的公共空间。
The lush vegetation helps to improve indoor air quality by naturally filtering toxins in the air. Besides these, setting up the LED lights, PV panels, water reclamation and usage of recycling materials are the other great aspects of this building. The construction had begun with the demolition of an outdoor workshop on the south side of the Architecture building. The existing shed housing the electric services had to remain in continual operation. As a result, the addition was carefully built above the existing mechanical room, and this became the site for the new glass-enclosed 121-seat auditorium and a 'Jury room' with a big common space at the entry.
© James Ewing Photography
詹姆斯·尤因摄影
Architects Studio 804
Location Lawrence, KS, United States
Category Extension
Area 3000.0 ft2
Project Year 2015
Manufacturers Loading...
下载