National Cities Confederation Mira Arquitetos

2016-10-05 10:00
 © Leonardo Finotti
莱昂纳多·芬诺蒂
建筑师提供的文字说明。全国民主联盟总部设计的主要条件是根据巴西利亚市的城市背景建立一个大都市地区。为设计新建筑而采用的行动计划是以一些基本假设为基础的:
Text description provided by the architects. The primary condition for the design of thenew headquarters of Confederação Nacional dos Municípios (CNM) is the creation of a metropolitan area in line with the urban context of the city of Brasilia. The action plan adopted for the design of the new building is based in some fundamental assumptions:
-土地使用强调用户与已建景观的融合;
- The land use gives emphasis on integration of users with the built landscape; 
-基层的组织/等级应加强其作为主要地方趋同的职能;
- The organization / hierarchy of the ground floor should strengthen its function as the main local of convergence;
 © Leonardo Finotti
莱昂纳多·芬诺蒂
-倾向于建立一个明确和合理的结构体系,以保证建设的速度和经济性;
- Preference for a clear and rational structural system that will guarantee speed and economy in construction; 
-可持续建筑;
- A sustainable building;
该项目以白色金属体积的形式体现在一个轴上,它轻轻地漂浮在混凝土地下室上。体积的透明度创造了一种特殊的关系与他们的周围。
The project is embodied along an axis in the form of a white metallic volume floating gently on a concrete basement. The transparency of the volume creates a special relation with their surroundings. 
 © Leonardo Finotti
莱昂纳多·芬诺蒂
 
 © Leonardo Finotti
莱昂纳多·芬诺蒂
构建元素的排列是对项目在站点中的分布的直接响应:
The arrangement of the built elements is a direct response to the distribution of the program in the site:
-基地包括所有公共职能、容纳外部观众的空间(礼堂、门厅、支助室)以及起居空间(咖啡和餐厅);
- The base contains all the public functions, spaces to house the external audience (the auditorium, foyer, support rooms) as well as living spaces (coffee and restaurant); 
-最高法院拥有行政区域;
- The foil has the administrative areas; 
-屋顶露台上有会议室;
- In the roof terrace there is the meeting rooms;
-最后,在地下室,是车库和技术区、服务和维修区的附件。
- Finally, in the basement, is the garage and an annex to the technical areas, service and maintenance areas. 
 
 Ground Floor Plan

                            
 3rd Floor Plan
三楼图则
建议的指导原则是一楼的设计,我们设计了一个正方形,与地势中段相比略有凹陷,在两层展开,为该地段带来新的地形;在底层,有一个反射池引导行人走向接待处,让他们能够进入行政区域。在较低的一层,在基础上是市民广场,从那里你可以进入礼堂。一个楼梯连接两个层次,使事件的自动实现,而不影响行政区域的运作。底层有两个目的:它既是支持安置新的设置,也是一个与城市的接口。
The design of the ground floor was the guiding principle of the proposal. We have created a square, slightly sunken in relation to the midlevel of the terrain, which unfolds on two levels and results in a new topography for the lot. On the ground floor  a reflecting pool guides the pedestrian towards the reception, giving access into the administrative areas. In a lower level, in the base, is the civic square from where you can access the auditorium. A staircase connects the two levels allowing the realization of events autonomously, without affecting the functioning of the administrative areas. The ground floor has two purposes: it is both support for the settlement of the new set and an interface with the city.
 © Leonardo Finotti
莱昂纳多·芬诺蒂
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Architects Mira Arquitetos
Location Brasília - Brasilia, Federal District, Brazil
Category Municipal Building
Authors Luís Eduardo Loiola, Maria Cristina Motta
Collaborators Ana Carolina Sumares, Luís Felipe da Conceição, Marcelo Ribas, Luisa Leme Simoni, Gabriela Lira Dalsecco
Area 10488.0 m2
Project Year 2016
Photographs Leonardo Finotti
Manufacturers Loading...

                    

举报

加果

什么也没写

1772 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年