The Theatre Under Construction Stelmach I Partnerzy Biuro Architektoniczne
2017-02-23 22:00
架构师提供的文本描述。正在建设中的剧院在开工44年后完工。在40年中,它是一个可怜的形状,它只使用了部分。该项目从未完成的建造阶段开始维护并揭示了该建筑物的结构。空格表示经过的时间。建筑的新元素与过去(剧院前的古腾堡巴罗斯)、现在(多媒体外墙)和未来(屋顶上的特有花园)进行了讨论。新的表面连接重建的废墟是文化之巷-生机勃勃的地方。
Text description provided by the architects. The Theatre under Construction was finished 44 years after the start of its construction. During 4 decades it was in a pitiable shape and it was used only partly. The project maintained and revealed the structures of the building from the subsequent stages of unfinished construction. The space indicates the times that passed by. The new elements of the building discuss with the past (Gutenberg Barrows in front of the theatre), the present (multimedia façade) and the future (endemic gardens on the roof). The new surface joining reconstructed ruins is the Alley of Cultures – the lively place-to-be.
新建筑使用了未完工的旧砖块和砖墙。建筑物的附加部分采用人工处理后的不同结构的钢筋混凝土制成。
Product Description. The old, demolition bricks and brick walls from unfinished construction were used for the new building. The added parts of the building were made of reinforced concrete with different structuring obtained with manual treatment.
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计