The Theatre Under Construction Stelmach I Partnerzy Biuro Architektoniczne

2017-02-23 22:00
架构师提供的文本描述。正在建设中的剧院在开工44年后完工。在40年中,它是一个可怜的形状,它只使用了部分。该项目从未完成的建造阶段开始维护并揭示了该建筑物的结构。空格表示经过的时间。建筑的新元素与过去(剧院前的古腾堡巴罗斯)、现在(多媒体外墙)和未来(屋顶上的特有花园)进行了讨论。新的表面连接重建的废墟是文化之巷-生机勃勃的地方。
Text description provided by the architects. The Theatre under Construction was finished 44 years after the start of its construction. During 4 decades it was in a pitiable shape and it was used only partly. The project maintained and revealed the structures of the building from the subsequent stages of unfinished construction. The space indicates the times that passed by. The new elements of the building discuss with the past (Gutenberg Barrows in front of the theatre), the present (multimedia façade) and the future (endemic gardens on the roof). The new surface joining reconstructed ruins is the Alley of Cultures – the lively place-to-be.
 © Przemysław Andruk
3.Przemysław Andrk
 
 © Przemysław Andruk
3.Przemysław Andrk
 
 © Przemysław Andruk
3.Przemysław Andrk
新建筑使用了未完工的旧砖块和砖墙。建筑物的附加部分采用人工处理后的不同结构的钢筋混凝土制成。
Product Description. The old, demolition bricks and brick walls from unfinished construction were used for the new building. The added parts of the building were made of reinforced concrete with different structuring obtained with manual treatment. 
 © Przemysław Andruk
3.Przemysław Andrk
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

                    

举报

向北一路走

什么也没写

1763 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年