Tech901 archimania
2017-07-12 15:00
架构师提供的文本描述。Tech 901是一个非营利组织,它培训新的技术工作者,以应对IT行业的各种挑战,并为当地雇主提供增长资源。它们需要一个新的协作空间,能够适应与信息技术产业有关的多种职能。
Text description provided by the architects. Tech901, a nonprofit organization, trains new tech workers to take on the diverse challenges of the IT industry and provide growth resources for local employers. They required a new space for collaboration, capable of adapting to serve multiple functions related to the information technology industry.
动态协作区建立了设计理念。这个区域是由一个长浇筑的混凝土桌子组成的,里面有能量和数据能力,嵌入到40‘长6英寸长的核桃条中。一个对比的Homasote墙壁表面有助于将这个协作空间从休息室空间中分离出来,并为讨论和集中实现最佳的声学效果。线灯架空线与电源和数据插槽,以及电源九标志在入口处。这个空间可以容纳学生在课间使用的空间,为临时工作站提供空间,为科技创业公司会议提供一个表面,并充当公共活动的服务桌。
A dynamic collaboration zone established the design concept. This zone is made up of a long poured-in-place concrete table with power and data capability embedded into 40’ long six inch strip of walnut. A contrasting homasote wall surface helps to separate this collaborative space from the lounge spaces, and works to achieve optimal acoustics for discussion and concentration. A linear light overhead lines up with the power and data slots, as well as with the power nine logo at entrance. This space accommodates break out spaces for students to use between classes, offers space for temporary workstations, a surface for tech start-up company meetings and acts as a serving table for public events.
将设计重点扩展到协作,会议室是小型培训、测试或战争室的两倍。玻璃是用来隔断较小的办公室,以达到开放和光线通过的空间。42“高影片允许部分隐私和有效的办公空间。在非正式会议场所周围挂满了标记板油漆的墙壁,并开发了一座顶盖桥,以遮掩暴露在外面的机械和电气系统,这是非营利组织独特的新家,这是一个最近翻新的西尔斯分配设施,空置了20年
Extending the design emphasis on collaboration, a conference room doubles as small training, testing or war room. Glazing is used to partition smaller offices to achieve openness and light to pass through the space. 42” high film allows partial privacy and effectiveness in the office spaces. Walls with marker board paint surround informal meeting places, and a tectum bridge was developed to mask exposed mechanical and electrical systems nonprofit’s unique new home, a recently renovated Sears distribution facility that was vacant for 20 years.
最后建造费用为702 997美元,即143美元/SF。总建筑面积为4930 SF。该项目的顾问包括工程部OGCB和Pro Tec消防系统公司。为了防火。磨床台架
The final construction cost is $702,997 or $143/sf. The total building area is 4,930 sf. Consultants for the project included OGCB for engineering and Pro Tec Fire Systems Inc. for Fire Protection. Grinder Taber & Grinder, Inc. was the general contractor for this project. All photos by Hank Mardukas Photography.
Location Memphis, TN, United States
Category Offices Interiors
Photographs Hank Mardukas
举报
别默默的看了,快登录帮我评论一下吧!:)
注册
登录
更多评论
相关文章
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计
-
描边风设计中,最容易犯的8种问题分析
2018年走过了四分之一,LOGO设计趋势也清晰了LOGO设计