Kar – Khaneh Office Building DOT Architects

2018-03-02 00:00
结构Jalal Sajadian客户Mahnaz Sayah新浪更多规格少规格
Structure Jalal Sajadian Client Mahnaz Sayah sina More Specs Less Specs
 © Deed Studio
C.Deed Studio
架构师提供的文本描述。相邻建筑物的边界是这样的,根据城市法律法规,建筑物的西侧有一个45度的圆角,而东侧的建筑物的正面则落后10米,因为它的土地有两倍长。
Text description provided by the architects. The boundary of the adjacent buildings is such that in its western side, according to the city laws and regulations, the building has a 45-degree fillet, and the front of the building on the east, is 10 meters behind, due to the expansion of its land with a twice in length.
 © Deed Studio
C.Deed Studio
 Diagram 02
Diagram 02
 © Deed Studio
C.Deed Studio
只有该项目的南面才能提供自然光线,提供城市景观,用户是一家创意公司,工作时间长,因此,除了管理区、工作站、会议和集思广益区外,大厦还需要休息和娱乐空间。
It is only south facade of the project that allows in, natural light and provides urban views.The user is a creative firm who spends long hours at work, therefore, besides management zones, workstations, meeting and brainstorming areas, there is a need for rest and recreation space in the building.
 © Deed Studio
C.Deed Studio
垂直通道位于项目的北端。在东西延伸的空隙中,楼梯和办公室的北面都提供了自然的光线。此外,在空隙中增加了垂直绿色墙,给工作环境带来了新鲜感。
The Vertical access is located at the northern end of the project. With the placement of a void stretched along East-West, natural light was provided in the staircase as well as the northern front of the office. Also, the addition of a vertical green wall inside the void, brings freshness into the work environment.
 © Deed Studio
C.Deed Studio
节目的垂直分布方式是:管理室在上层,工作站和头脑风暴室在中间层,停车场在底层,休息和娱乐区域在地下室。
The vertical distribution of programs is in a way that the management rooms are on the upper floors, the work stations and brain storming rooms are in the middle floors, parking on the ground floor and the rest and recreational areas are laid down in the basement floor.
 
考虑到地块的狭小宽度,为了提高空间的效率,创造室内布局的灵活性,大部分封闭区域,如服务器室、文件柜和书架,都装在南立面的实心盒子里。
Considering the small width of the plot, in order to increase the efficiency of the space and create flexibility in interior’s layout, most of the enclosed areas such as server rooms, filing shelves and bookshelves were packed in the solid boxes on the south facade.
 © Deed Studio
C.Deed Studio
为了响应邻居45度的圆角边缘,并考虑到建筑物的前边框由法规设置,南立面由一种有节奏的模式形成,这是与实心群众和窗户玩耍的结果。其结果是,在建筑物的城市表面上形成花盒的立面上有一个背,从里面和外面都增添了新鲜感。另外,在一天中不同的时间里,放置在外墙上的盒子会引起阴影的舞动,从而产生一个充满活力的城市面孔。
In response to the neighbor’s 45 degree fillet edge and considering the building’s front border set by regulations, the south façade was formed by a rhythmic pattern which is the result of playing with solid masses and windows. As a result, there are set backs on the façade which form flower boxes on the urban face of the building and add freshness both from inside and outside. Also displaced boxes on façade cause dance of shadows in different hours of the day and result in having a dynamic urban face.
 
这座建筑的正面与它的东邻之间有10米的距离,因此在东面有一个空白的立面。为了符合城市在侧壁上使用白色水泥的法律和条例,并为了创造一个三维建筑质量,南面也用白色水泥覆盖。水泥表面出现裂缝的风险通过在水泥中添加外加剂和用U型钢分隔大面积,大大降低了裂缝的风险。在水泥上使用双层防静电材料,可以降低水泥的吸收效率,也可以防止德黑兰这样污染城市的外墙吸收污垢。为了创造一个独特的图案,在最后的渲染中使用了一个特殊的梳子,在外观上创建了一个线性的水平图案。
There is a 10 meter difference between the front border of this building and its eastern neighbor which results in having a blank façade on the east. To meet the city laws and regulations of using white cement on side fire walls and in order to create a three dimensional building mass, the south façade was also covered with white cement. Risk of cracks appearing on the cement façade was reduced dramatically by adding additives to the cement and also dividing large areas by U steel profiles. Use of double layer of anti-static material on the cement, reduces absorption efficiency of the cement and also prevents the façade from absorbing dirt in a polluted city like Tehran. In order to create a unique pattern, a special comb was used on final rendering which created a linear horizontal pattern on the façade.
 © Deed Studio
C.Deed Studio
空墙和南面花箱中的绿色墙配备了自动浇水系统,便于维护和使用建筑物的灰色水。设计团队的所有努力都是为了创造一个动态的工作场所,在工作环境中产生创造性。
The green wall in the void and flower boxes on the south façade are equipped with automatic watering system, and have easy accessibility for maintenance and they use the grey water of the building. All efforts by design team was to create a dynamic work place to produce creativity in the work environment.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Architects DOT Architects
Location Tehran, Tehran Province, Iran
Lead Architects Arash Pirayesh, Mehran Haghbin
Design Team Mona Eghtesadi, Tooka Mahmodian, Bahar Ehsan
Area 700.0 m2
Project Year 2017
Photographs Deed Studio
Category Offices
Manufacturers Loading...

                    

举报

疯笑院

什么也没写

1858 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    投稿

    rs@rushi.net

    微信交流群

    返回页面顶部
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年