The Green House architectenbureau cepezed
2018-06-28 05:00
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
架构师提供的文本描述。2014年,天花板公司被委托在乌得勒支克洛塞兰河畔的前Knoopkazerne建造一个现代化的政府办公室。中央政府房地产公司还要求解决Knoopkazerne和邻近的Rabobank总部之间的空间问题。由于这一地点的最终目的地将在15年后决定,因此要求作出临时解释,以便使本来将保持空缺的地区更加活跃。CEPEED开发了一个基于循环性的功能和体系结构的方案。
Text description provided by the architects. In 2014 cepezed was commissioned to make a modern government office from the former Knoopkazerne on the Croeselaan in Utrecht. The Central Government Real Estate Company also requested a solution for the space between the Knoopkazerne and the adjacent head office of Rabobank. Because a definitive destination for this location will be decided in fifteen years, a temporary interpretation was sought that could make the area that would otherwise remain vacant, more lively. cepezed developed a plan in which both the function and the architecture are based on circularity.
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
Axonometric
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
绿色之家提供“循环”餐厅概念和会议设施。根据圆形原则,建筑物(包括预制混凝土砌块的基础)是完全可拆除的。十五年后,它可以在其他地方建造。目的还在于尽可能多地实现可重复使用的材料。
The Green House accommodates a 'circular' restaurant concept plus meeting facilities. In accordance with the principles of circularity, the building (including the foundation of prefab concrete blocks) is completely dismountable. In fifteen years it can be built up elsewhere. The aim was also to implement reusable materials as much as possible.
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
两层楼高的展馆被设计成一个通用的建筑套件,带有一个由镀锌型材制成的可移动钢框架。这些尺寸来自于前Knoopkazerne的烟幕玻璃面板,它们被重新用于展馆的第二层皮肤和温室。建筑物的圆形也取决于在正确的地方选择正确的楼层。在蒂尔的一个旧码头的街道熟料取代了经典的一层,已经倒了。它们位于有地板加热的压实沙层上。
The two-storey pavilion is designed as a generic building kit with a removable steel frame made of galvanized profiles. The dimensions are derived from those of the smoke glass facade panels of the former Knoopkazerne; these have been re-used for the second skin and the greenhouse of the pavilion. The circularity of the building also lies in the choice of the right floor in the right place. Street clinkers from an old quay in Tiel replace the classic ground floor that has been poured. They are located on a compacted sand bed with underfloor heating.
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
一楼由预制木构件组成。考虑到餐厅的声学特性,分板被穿孔,元件被填充绝缘。对于屋顶,选择落在一个轻钢板,也是穿孔和填充绝缘。有了玻璃幕墙,展馆的底座是完全透明的。对于一楼立面的封闭部分,使用了预制木框架板。这些都是100%的可回收和(H)氟氯化碳-免费。
The first floor consists of prefabricated wooden elements. In view of the acoustics in the restaurant, the sub-plating is perforated and the elements are filled with insulation. For the roof, the choice fell on a light steel sheet that was also perforated and filled with insulation. With a glass curtain wall, the plinth of the pavilion is completely transparent. For the closed parts of the façade on the first floor, prefabricated timber frame panels were used. These are 100% recyclable and (H) CFC-free.
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
80平方米的垂直农业温室位于会议室旁边的地板上。在这里,蔬菜和草药是为餐厅厨房种植的。展馆里有一条通道,从下面的餐厅可以看到可供公众进入的温室。巨大的绿色墙对绿色住宅的经验也有很大的贡献。展馆的屋顶布满了太阳能电池板。
The vertical farming greenhouse of eighty square meters is located on the floor next to the meeting rooms. Here vegetables and herbs are grown for the restaurant kitchen. A vide in the pavilion makes the publicly accessible greenhouse visible from the restaurant below. The large green wall also contributes significantly to the experience of The Green House. The roof of the pavilion is filled with solar panels.
The green house
绿屋
“绿色之家”是第一家拥有无交流电源的厨房,其中的食物是在没有电的情况下准备的,而是用可再生燃料燃烧的节能烤箱。随着城市采矿,很大一部分内部已经被发现,新的家具已被使用的回收材料。
The Green House is the first to have a ac-plug-free kitchen in which food is prepared without electricity but with energy-efficient ovens fired with renewable fuels. With urban mining a large part of the interior has been found and the new furniture that has been used is made from recycled materials.
© cepezed | Lucas van der Wee
(C)cepeed\Lucas van der Wee
Architects architectenbureau cepezed
Location Croeselaan 16, Utrecht, The Netherlands
Project Team Ronald Schleurholts, Jaap Bosch, Ruben Molendijk, Robertus de Bruin, Mathieu de Danschutter
Area 680.0 m2
Project Year 2018
Photographs cepezed | Lucas van der Wee
Category Sustainability