HiCC Ent. Headquarter LESS

2018-09-07 19:00
建筑师提供的文字说明。该项目已完成,目的是为商业应用开发k-Pop娱乐公司的区域。客户希望具有流体结构而不是静态和固定的建筑物来表示和封装其业务的特征。
Text description provided by the architects. The Project was completed with the objective of highly developing the area for a K-pop entertainment company for commercial use. The Client desired to have a fluid structure rather than static and stationary building to represent and encapsulate the character of their business.
Text description provided by the architects. The Project was completed with the objective of highly developing the area for a K-pop entertainment company for commercial use. The Client desired to have a fluid structure rather than static and stationary building to represent and encapsulate the character of their business.
 Diagram 01
Diagram 01
我们在这个问题上的解决方案是对现有的体系结构进行小规模的改变,通过参数控制的模块单元和双向的扭结设计形状,从而在整体上实现更大的效果。反过来,这又使建筑的立面产生了大规模运动的错觉。
Our Solution on this issue was to make small scale changes to the existing architecture, which in turn achieved a grander effected in totality through parametrically controlled module unit with 2-way kink design shape. In turn, this positioned the building façade to create the illusion of movement on mass in a large scale.
Our Solution on this issue was to make small scale changes to the existing architecture, which in turn achieved a grander effected in totality through parametrically controlled module unit with 2-way kink design shape. In turn, this positioned the building façade to create the illusion of movement on mass in a large scale.
 Courtesy of LESS
不礼貌的
 Diagram 02
Diagram 02
我们解释了各种场地基础,以及建筑规范问题,以产生建筑的效果与运动和主动系统,以产生整体外观。最后,通过重复以多种方式组成的最小元素来优化外观系统,以实现更大范围内的另一个元素。该结构还将连接位置作为另一个重要的参数,为整个建筑创造更大的变化和表达。
We interpreted various site bases, and the building code issues to generate the effect of a building with movement and active system to generate the overall façade. In the end façade system was optimized through the repetition of the smallest elements composed in several ways to achieve another element on a larger scale. The structure also connection position as another important parameter to create greater changes and expression for the building as a whole.
We interpreted various site bases, and the building code issues to generate the effect of a building with movement and active system to generate the overall façade. In the end façade system was optimized through the repetition of the smallest elements composed in several ways to achieve another element on a larger scale. The structure also connection position as another important parameter to create greater changes and expression for the building as a whole.
 Courtesy of LESS
不礼貌的
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

                    

举报

小苗说

//北京市

1785 作品/ 0 人气

  • 别默默的看了,快登录帮我评论一下吧!:)

    注册 登录

    更多评论

    推荐作品


    相关文章

    下载

    加入到画夹管理

    添加画夹

    提示

    右键保存、高清大图仅支持VIP会员
    名师作品集【专享】
    全网名师最多、更新最快、作品最全
    作品库【无限查阅、一键下载】
    全球最大室内作品库,超33万部
    精品资料【下载】
    全年精品资料更新超1000部
    灵感搜索【原图下载】
    中文搜索全球顶尖案例灵感图
    设计师生活馆【内购价】
    5大电商平台官方合作,专享内购价
    CAD库【模型下载】
    cad单体模型库精准搜索查找下载
    免广告打扰【屏蔽】
    屏蔽全站广告,享受纯净体验
    3D模型【送199币值199元】
    分享全网最新精品3D模型
    名师与资料完善后,价格涨至699元/年