Hodolany Resort Atelier
2018-10-05 19:00
客户端KA.S室内设计Pavel Kříž更多规格少规格
Client ENDL + K a.s Interior Design Pavel Kříž More Specs Less Specs
Client ENDL + K a.s Interior Design Pavel Kříž More Specs Less Specs
架构师提供的文本描述。在过去的20年里,最初的霍多拉尼剧院大楼一直是舞台布景的仓库。经过一段时间没有适当的维修,该建筑物开始出现技术缺陷,并被出售给私人业主。该项目的目的是就剧院及其周围的规划用途提交一份在建筑上合理的修改,以及寻找最佳的城市规划与周围住房发展的联系。
Text description provided by the architects. For the last 20 years the original Hodolany Theatre building has served as a warehouse for stage sets. After a period without proper maintenance the building started to develop technical defects and was sold to a private owner. The aim of the project was to submit an architecturally reasonable modification of the theatre and its surroundings in relation to its planned use as well as to find optimum city-planning connection of the premises with the surrounding housing development.
Text description provided by the architects. For the last 20 years the original Hodolany Theatre building has served as a warehouse for stage sets. After a period without proper maintenance the building started to develop technical defects and was sold to a private owner. The aim of the project was to submit an architecturally reasonable modification of the theatre and its surroundings in relation to its planned use as well as to find optimum city-planning connection of the premises with the surrounding housing development.
© ENDL + K a.s
C.Endl K A.S.
重建项目的概念是保持历史建筑的原始形状,并以现代材料补充其新用途。目前,剧院房舍是支持度假村管理办公室的上层建筑的主要入口。
The concept of the reconstruction project was to maintain the original shape of the historic building and complement it with contemporary materials for its new use. Currently, the theatre premises serve as the main entrance with the superstructure supporting resort management offices.
The concept of the reconstruction project was to maintain the original shape of the historic building and complement it with contemporary materials for its new use. Currently, the theatre premises serve as the main entrance with the superstructure supporting resort management offices.
新建筑是简单的积木,敏感地补充了原始建筑,并通过使用现代材料,即玻璃和十层预风化板来区分。在南面原来的剧院里,加了一个低街区,上面盖着十张加了赌场的床单。赌场里有一家有玻璃墙的餐厅.你可以进入度假村西侧的一个高大的街区,它的正面被设计成玻璃和cor-10的结合,穿过停车场入口上方的连接颈。这幢楼里有一家旅馆和健康中心。在两个新的按摩之间,有一个原始的混凝土墙,决定了度假村的内部空间。
The new buildings are simple blocks which sensitively complement the original and are distinguished by the use contemporary materials, namely glass and COR-TEN pre-weathered sheets. A low block covered by COR-TEN sheets with a casino was added to the original theatre on the southern side. The casino houses a restaurant with a glass-walled facade. You can enter a tall block on the western side of the resort, whose facade was designed as a combination of glass and COR-TEN, through the connecting neck above the entrance to the car park. In this building there is a hotel and wellness centre. Between the two new massings there is a raw concrete wall defining the inner space of the resort.
The new buildings are simple blocks which sensitively complement the original and are distinguished by the use contemporary materials, namely glass and COR-TEN pre-weathered sheets. A low block covered by COR-TEN sheets with a casino was added to the original theatre on the southern side. The casino houses a restaurant with a glass-walled facade. You can enter a tall block on the western side of the resort, whose facade was designed as a combination of glass and COR-TEN, through the connecting neck above the entrance to the car park. In this building there is a hotel and wellness centre. Between the two new massings there is a raw concrete wall defining the inner space of the resort.
© ENDL + K a.s
C.Endl K A.S.
该项目还包括一个更新的交通解决方案,该解决方案基于从VelkorMoravskin街出口到TovahouOvskinho街的出口。度假村的主要入口以及到停车场的入口位于Ostravskin街的北面,后者位于庭院和地下室。供应被运送到地下。
The project also includes an updated traffic solution based on the reconstruction of the exit from Velkomoravská street to Tovačovského street. The main entrances to the resort as well as entries to the car park are located on the northern side of Ostravská street, the latter situated both in the courtyard, and basement. Supplies are delivered underground.
The project also includes an updated traffic solution based on the reconstruction of the exit from Velkomoravská street to Tovačovského street. The main entrances to the resort as well as entries to the car park are located on the northern side of Ostravská street, the latter situated both in the courtyard, and basement. Supplies are delivered underground.
Architects Atelier-r
Architect in Charge Miroslav Pospíšil
Area 2011.0 m2
Project Year 2015
Photographs KRESPO, ENDL + K a.s, atelier-r
Category Hotels
Manufacturers Loading...
推荐作品
下载