架构师提供的文本描述。新图书馆在格里姆斯坦纳有一个中央,滨水区的位置。它位于老城镇和新市镇中心之间。其意图是使图书馆不仅成为一个读书和借书的地方,而且成为一个社会交汇点,借此举办各种文化活动。这座建筑人人都可以进入。
Text description provided by the architects. The new library in Grimstand has a central, waterfront location. It lies between the old town and the new town center. The intention is for the library to not only be a place to read and borrow books, but for the building to become a social meeting point with the opportunity to host a variety of cultural events. The building is accessible for all.
Text description provided by the architects. The new library in Grimstand has a central, waterfront location. It lies between the old town and the new town center. The intention is for the library to not only be a place to read and borrow books, but for the building to become a social meeting point with the opportunity to host a variety of cultural events. The building is accessible for all.
© Sindre Ellingsen
c Sindre Ellingsen
上下文是架构的重要驱动因素。这座建筑是一条有盖的人行道,连接北方的老城镇和南部的新市镇中心。这条通道充满了一个公共和文化项目,供所有城镇居民和游客享用。
The context acts as an important driver for the architecture. The building acts as a covered walkway connecting the old town in the north and new town center in the south. This passageway is filled with a public and cultural programme for all the towns inhabitants and visitors to enjoy.
The context acts as an important driver for the architecture. The building acts as a covered walkway connecting the old town in the north and new town center in the south. This passageway is filled with a public and cultural programme for all the towns inhabitants and visitors to enjoy.
Floor plan 01
平面图01
© Sindre Ellingsen
c Sindre Ellingsen
Floor plan 02
平面图02
工地上的一幢现有建筑,加上预算,构成了该项目的有限框架。然而,这一限制被认为是积极的;旧结构部分保留下来,并作为新的轻型木材结构的基础。建筑体积紧凑,木材结构合理。木结构框架放置在现有混凝土建筑的顶部,间距为3米。
An existing building on the site, together with the budget, formed a limited framework for the project. However, this limitation was looked upon as a positive; the old structure is partially kept and acts as foundations for the new light timber structure. The compact volume of the building has a rational timber structure. The timber frames are placed with a spacing of 3m on top of the existing concrete building.
An existing building on the site, together with the budget, formed a limited framework for the project. However, this limitation was looked upon as a positive; the old structure is partially kept and acts as foundations for the new light timber structure. The compact volume of the building has a rational timber structure. The timber frames are placed with a spacing of 3m on top of the existing concrete building.
© Sindre Ellingsen
c Sindre Ellingsen
这座大楼有三层楼。主要图书馆在一楼运作,第二层有一个隐蔽的儿童区。行政当局在一楼被发现。此外,大楼还设有咖啡厅、礼堂和展览空间。这些设施离厕所很近,因此有可能在晚上的活动中关闭这一区域。
The building is organized over three floors. The main library functions on the first floor with a secluded children’s area on the second. The administration is found on the ground floor. Additionally the building houses a café, auditorium and exhibition spaces. These are in close proximity to toilet facilities making it possible to close off this zone for evening events.
The building is organized over three floors. The main library functions on the first floor with a secluded children’s area on the second. The administration is found on the ground floor. Additionally the building houses a café, auditorium and exhibition spaces. These are in close proximity to toilet facilities making it possible to close off this zone for evening events.
Section 01
Section 01
通过改变预制的东西面板之间的垂直北面开口,形成一个动态的立面。这描绘了内部运动,而建筑在新旧之间进行谈判。
By varying the vertical north-facing openings between the prefabricated east and west facing panels makes a dynamic façade. This portrays the interior movement, while the building negotiates between new and old.