‘Allende’ Performance hall and rehearsal studios in Mons-en-Baroeul
Client : Ville de Mons-en-Baroeul
Architect : Dominique Coulon & associés
Dominique Coulon, Olivier Nicollas
Architects assistants : Fanny Lienart, Lukas Unbekandt, Thibaut Muller, Guillaume Wittmann, Diego Bastos-Romero
Construction site supervision : Damien Surroca Architects
Engineers and consultants :
Structural Engineer : Batiserf Ingénierie
Electrical Engineer : BET Gilbert Jost
Mechanical Plumbing Engineer : BET Gilbert Jost
Environmental Engineer : Impact QE
Scenographer : Changement à vue
Cost Estimator : E3 Économie
Acoustics : Euro sound project
Program : Performance hall 500 seats, 1000 standing places, a large rehearsal room, music creation studios, recording studio.
Address : 2 Avenue René Coty, 59370 Mons-en-Baroeul
Google Maps location : 50°38’29.1″N 3°06’42.0″E
Surface : 2 336 sqm
Budget : 6 000 000€
Schedule :
Competition : October 2012
Plans and technical phases : from march 2013 to april 2014
Construction : from October 2015 to september 2017
Construction companies : Earthworks road works (RAMERY), special foundations – structure – metal structure – drainage (TOMMASINI), screed (CDI), water proofing (GENTY), exterior steel joinery (Ent. OLIVIER), metal works (TUBE 2000), plastering (PLATRES MODERNES JOBIN), interior wood joinery (VANHENIS), tiles (CK CARRELAGE), sols souples (LD DECORATION), interior and exterior painting (INDIGO), elevators (SCHINDLER), electricity (COEXIA), plombing and drainage (LECLERC), heating and ventilation (COFELY), scenic works (MECASCENIC), scenic curtains and drapes (TEVILOJ), téléscopic seating system (HUGON), network and scenic equipment (MANGANELLI), waxed concrete (FLOORCOLOR)
Photography : Eugeni Pons, David Romero-Uzeda